Saturday, March 14, 2015

Improving NewYork's Syracuse I-81 Reconstruction Plan




So far the official planning for the reconstruction of I-81 through downtown Syracuse New York:

Sandbags below ground freeways with inadequate and wasteful designs.

Tunnels that are either needlessly deep or long thus increasing construction costs.

With downtown tunnels and open trench designs all hobbled by need to connect with existing elevated I-690 segment, thus presenting ramps that sever street intersections.

Thus leaving the sole freeway option of a rebuilt viaduct  -- without any discussion of innovative underside design.

With the sole remaining no freeway option of a mere boulevard, that's going to cost $1+ Billion anyway, effectively steering the decision process to that latter option.

These were the downtown freeway options considered:

Syracuse Lowered I-81 Option

TUNNELS

CUT AND COVER

T-1 Almond Street Tunnel from MLK East to Butternut Street $2.651 Billion

T-2 Almond Street Tunnel from MLK to Genesee Street $1.761 Billion

T3 Townsend Street Tunnel under Oakwood Avenue and Townsend Street from about MLK East to Butternut Street-- $2.643 Billion

MOLED

T4 Eastern Alignment Tunnel $3.298 Billion

OPEN TRENCH

DH-1  Depressed Highway from Adams Street to Butternut Street- $1.751 Billion

DH-2 Depressed Highway from Adams Street to Genesee Street- $1.503 Billion
 
Syracuse Elevated I-81 Options

V-2  New Viaduct Fully Improved to Current Standards- $1.438 Billio

V3 New Viaduct with Substantial Design Improvements- $1.423 Billion

The difference in the downtown Almond Street Tunnel and Trench Options is the location of the northern end: either Genesse Street to south of  I-690, or Butternut Street to the north.

Because of the ramp connections to elevated I-690, the tunnel and trench options would severe a number of local streets: Erie Boulevard, Water Street, Washington Street, Fayette Street, Almond Street (to Northside), McBride Street(to Northside), and VanBuren Street.

Meanwhile, the options to eliminate the freeway for a surface boulevard were all at about $1.0 billion.

Syracuse I-81 Tunnel Options Officially Considered

Of the 4 tunnel options, 3 are cut and cover, with 2 that follow the existing I-81 right of way, yet have their roofs some 20 feet below ground, significantly deeper than simply a lidded trenched freeway.

The 4th tunnel option is moled-drilled, way to the east on a far longer and deeper route.

http://photos.syracuse.com/4456/gallery/four_tunnel_options_for_replacing_interstate_81/index.html#/5

The official planning in 2014 concluded:
https://www.dot.ny.gov/i81opportunities/alternatives

(see the "conclusions" at page 24: page 32 on the pdf indicator):
http://www.thei81challenge.org/cm/ResourceFiles/resources/WhitePaper3_FINAL_082713.pdf

a tunnel would be prohibitively expensive

Depressed highway would create a new barrier that
would be more difficult for cars and pedestrians to cross
and create accessibility problems for people with
disabilities.

http://www.syracuse.com/news/index.ssf/2014/06/ny_dot_tunnel_depressed_highway_not_recommended_for_i-81_report_says.html

The least expensive tunnel - T-2 Almond Street Tunnel from MLK to Genesee Street - would cost $1.761 Billion, while the open trench and replacement viaduct options range from $1.4 to 1.75 Billion.




With excavation depth a considerable factor in the cost of cut and cover tunnel construction, why did the official planning consider cut and cover tunnels that are deeper than necessary.

What about a shallow tunnel -  aka a covered version of the proposed depressed freeway?

The open trench option meanwhile is presented with zero consideration of adding a roof.

Note the two options that are roughly similar in length:

 T-1 Almond Street Tunnel from MLK East to Butternut Street $2.651 Billion

 DH-1  Depressed Highway from Adams Street to Butternut Street- $1.751 Billion

That represents a difference of $900 million between a tunnel and an open trench.

How much less would such an option to build a tunnel, but as a covered version of the shallower excavation of DH-1?

That would reduce construction costs over a deeper excavation, yet is NOT included in the study.

Nor were any options for a depressed freeway that is designed to support the subsequent addition of a roof thus presenting the option of spreading out some of the costs over time, like Cincinnati's I-71 Fort Washington Way.

And with the downtown tunnel and trench options being dropped due to the issue of the severing of the street grid, why did the officials only consider downtown tunnel and trench proposals that did such owing to the requirement to maintain connections with the existing elevated I-690 segment?

But why maintain connections to an outdated elevated highway segment that will eventually need replacing?

If we are really serious about reconnecting downtown Syracuse, we would ultimately plan to do something regarding the eventual reconstruction of I-690, perhaps lowering that into a trench would could be covered over with parkland and new real estate development.  Imagine both freeways dropping underground to cross beneath N. Salina Street, with I-690 remaining below grade at least until N. Crouse Avenue?

Doing all of that now would likely be considered too expensive for a single project.

But why deny the opportunity to lower and tunnel the north-south I-81 segment.  And why hobble downtown Syracuse with major investments in ramp connections that sever the downtown for the existing outdated elevated downtown I-690 segment.

Instead, build a downtown I-81 Tunnel that disregards such connections and is of sufficient length to pass to the north side of I-690, that is, to Butternut Street.  Yet one that leaves space/design flexibility to add such connections later in a future project to lower that downtown portion of I-690: a latter project that could be partially funded by the sale of air rights over the newly lowered I-690 segment.

Such is the potential of a recent political initiative of a group of elected officials are challenging this study.

They are calling for a 'hybrid' option of a cut and cover tunnel beneath a new surface boulevard as the best of all worlds, via a design by Destiny USA.



This design extends the cut and cover I-81 Tunnel north of I-690 to Butternut Street, as per the official "T-1" option.

However, it does so without the ramp connections to I-690.

(Thus this design eliminating most of the street severings- leaving only that for a one block segment of East Water Street, immediately next to an Erie Boulevard that would remain continuous, while providing a new traffic circle with its intersection with Almond Street.)

And it is about 1,500 feet shorter at its southern end, extending not to MLK Boulevard, but only to East Taylor Street.

Thus it should be somewhat less expensive then the $2.6 Billion of the "T-1" option.


No word if this design has the shallow excavation of the trench options as "DH-1", or deeper as with the cut and cover options as "T-1".

If the authorities object to the lack of connections with I-690, they could deal with this in a staged manner:

- Construct a "u" turn ramp from I-81 nb to sb to the north, perhaps in the vicinity of West Court Street.  In conjunction with the already planned new flyovers from I-81 to the north and I-690 to the west, this would allow all of the movements of the I-81/I-690 interchange. 

- incorporate stub connectors for direct connections into the new tunnel, perhaps fully building the I-81 nb to I-690 eb ramp, as the easiest to construct, with it emerging just east of Almond Street with some 1,000 feet to rise to merge with I-690 before North Crouse Avenue; and build the short segment of the I-690 wb to I-81 sb underground ramp that would pass directly beneath the new I-81 tunnel, but deferring its completion and that of the others to a future project to depress the downtown segment of I-690.

Such would eliminate the need to construct lengthy ramps that would sever the downtown street grid for connecting to an elevated freeway that would one day need replacing- and preferably lowing and covering.

Building only a single underground ramp connection that splits off to the right -- northbound I-81 to eastbound I-690 - and a stub connection for an underground connection from westbound I-690 to southbound I-81 would be the minimum requirement for incorporation into the current project.

The other ramp connections would be accomplished with the "u" turn ramp in the West Court Street area, in conjunction with the elevated connections between I-81 from the north and I-690 from the west.

Use some of the money from this design economization to make the downtown I-81 Tunnel wider with at least 3 or preferably 4 lanes per direction.

And keep an eye on the design to accommodate future projects to lower I-81 to the south and the downtown segment of east-west I-690.

The I-81 Destiny USA hybrid tunnel-boulevard plan is a definite step in the right direction.

http://www.savei81.org/

http://www.syracuse.com/news/index.ssf/2014/07/destinys_idea_for_i-81_in_syracuse.html

http://www.syracuse.com/opinion/index.ssf/2014/07/sen_john_defrancisco_i-81_editorial_was_too_hasty_to_dismiss_tunnelboulevard_com.html

http://www.syracuse.com/news/index.ssf/2014/07/cny_lawmakers_to_nydot_consider_destinys_idea_for_i-81.html#incart_river_default


Friday, March 13, 2015

Cap Philadelphia's I-676 Vine Street Expressway



http://www.cap676.com/about/

Cap  676 is  a vision for a connected Philadelphia. The project is a crowd sourced effort to plan and progress the development over Interstate 676 in Philadelphia into a strip of green parks and amenities running across the  city.

The building of Interstate 676 cut a boundary through the center of Philadelphia, dissecting north Philadelphia from Center City.  Although Interstate 676 has caused many issues for Philadelphia and its citizens, the way  it was built was actually a blessing. This project will not cost tens of billions of dollars like the  Big  Dig project in Boston. No tunnel will need to be dug. Interstate 676 is already below ground level, and  putting a cap over this highway is a much more feasible undertaking than other projects that have remedied the auto-centric development of past decades.

Imagine  the benefits of a capped  676. Similar projects across the country and world have increased the quality of life for citizens, increased surrounding property values, spurred development, and increased tax revenues for municipalities.

Cap 676 seeks to gather the opinions, needs, and  wants of the community of Philadelphia in order to crowd source the ideal vision for a capped Vine Street Expressway. The goal is to put together our minds, talents, and resources in order to turn this vision into a reality. Let’s put a green belt on the waist of Philadelphia!

 

 

 
 

 A new direct freeway connection to the Benjamin Franklin Bridge

 

http://www.cap676.com/blog/

The first phase of capping Interstate 676 has been funded and  approved, but many people believe that this phase should go further. As part of a $120 million PennDOT project to revamp the western section of Interstate 676, a small section of the highway will be capped. Although  this sounds great, and it is definitely better than nothing, it is definitely a missed opportunity. The project is focused on improving the auto bridges that run over the Vine Street Expressway. The section that is being capped is on the northwest corner of Logan Square, a public space that was dramatically impacted by the building of the highway. The top quarter of the park was turned into a highway canyon because of the auto-centric thinking of city planners decades ago.

 Steve Anderson's Vine Street Expressway Overview


 http://www.phillyroads.com/roads/vine/

Thursday, March 12, 2015

Mandatory For Any Trenched Freeway Project


Install the necessary support substructure before project completion in order to make it easier to add extra lid segments later.

To get an idea of what this may involve, see the following photos of the recent (1998-2000) $323 million reconstruction of the I-71 Fort Washington Way segment in Cincinnati, Ohio.






http://www.cincinnati-transit.net/fww-tunnel.html

Funding for the pile driving was secured and actual work took place from Feb 2000 through August. Four decks of various sizes between originally planned overpasses will combine for a total tunnel length of 1200ft. 750 piles were driven, with 3 rows of 250 along the north edge, south edge, and median between the eastbound and westbound lanes. The cost of the pile driving was $10 million and estimated cost of the future supports and actual decking is $46 million. $14 million was saved by driving the piles before reconstruction was complete. The deck will not be built until at least 2005, when development south of the expressway is complete. The deck itself will be designated as a park, and so therefore will be eligible for funds from additional sources


Examples:

http://cos-mobile.blogspot.com/2015/03/denver-i-70-lower-cover-project.html

http://cos-mobile.blogspot.com/2014/02/birmingham-2059.html


Tuesday, March 10, 2015

Anti Grade Seperation Dogma Over Common Sense

recent article at Greater, Greater Washington a textbook example of reactionary anti freeway dogma over riding common sense (even hurting pedestrians and cyclists)

http://greatergreaterwashington.org/post/25947/expand-a-highway-to-get-a-sidewalk-how-about-just-build-the-sidewalk/#comments

Dan Reed needs to show the broader picture
showing the proximity with the recently constructed ICC interchange


The GGW article, "Expand a highway to get a sidewalk.  How about just build the sidewalk?"  authored by Dan Reed, creator of the blog Just Up the Pike reports negatively upon MDOT's new project for a segment of MD Route 29 in Fairland, Maryland, about 15 miles northeast of Washington, D.C. involving creating some new walkways/bike paths, the partial closing of an at grade intersection and the replacement of anther with an overpass.

The article is particularly negative about the project's creation of a grade separated interchange for the currently at grade traffic light intersection of Route 29 with Fairland Road for a new overpass the carry the latter (a local road) over the former (a 6 to 8 lane major arterial that's generally a freeway with a few remaining at grade intersections though with most others already replaced with overpasses.

It makes some sense, particularly in noting the elimination of the Musgrove Road crossing of 29, maintaining its access to and from northbound 29 but making it a dead end on the northern side, though failing to bring itself to suggest a new grade separated there- even if only for pedestrians and cyclists!

Likewise it notes the greater development in the suburbia-exurbia creating the 10% increase in vehicular traffic since 2006.

Alas the article hobbles its sensible suggestions with its anti grade seperation dogma.

It notes the need to improve bus service on the 29 corridor though alas without noting the need for greatly improved bus stops- mini stations.

It notes the lack of space for grade separated interchanges, or rather more correctly, those of the sprawling type seen in the suburbs and rural areas further south into Silver Spring and Washington, D.C., which limits the 29 freewayification to the area north of New Hampshire Avenue to I-70.

Yet that ignores the clear advantages of 29 as a full freeway to the north of New Hampshire Avenue for increasing bus line speed over the relatively longer distances to this new development.

And most starkly, the article makes no mention of the proximity of the Route 29/Fairland Road intersection with the recently constructed grade separated interchange with the Inter County Connector Freeway (ICC).  

As if pedestrian safety is served by denying a full grade separated interchange for Fairland Road with such a major grade separated interchange so close by.

Instead the article rests upon dogmatic statements as:

Research shows that building more roads in an effort to cut congestion is actually counterproductive. The roads eventually just fill with more cars as drivers use the new road space to drive more or longer distances than they used to.

That makes no acknowledgment of the greater efficiency of freewayification that the existing lanes can thus carry more traffic.

Would not it be better to advocate improved grade separated crossings for pedestrians and cyclists in addition to automobiles?

Why so much dogmatic negativity rather than a more holistic approach that actually addresses the area in question?

Why not call for a new grade separated interchange for Musgrove Road, as well as Fairland Road, with wider sidewalks than that now proposed for the latter?

Indeed, if one wants to really better connect the area, how about a plan for such new grade separated crossings to ultimately flank a new air rights lid atop 29 for new development, built over time in stages?