Tuesday, March 24, 2015

The Overlooked Link- Bus Stop Stations


Constructing innovative bus stop stations would do much to popularize the use of bus and van service yet get strangely overlooked by most of the pro transit community.

http://archinect.com/features/article/84832196/showcase-barneveld-noord-station-by-nl-architects



Unmanned transit platforms, floating in the outside plane, can be lonely nowhere-lands in the anxious midst of travel. Or, under the "Prettig Wachten" campaign in the Netherlands, they can become cozy havens, reclaiming the time spent waiting as leisure. For the platform at Barneveld Noord station, NL Architects designed a refuge out of glass and shipping containers, creating a strip of space on the platform that is both protected and unobtrusive. A section within the glass enclosure is reserved for a cafe — a massive upgrade from the decrepit vending machine soldier, stationed far from civilization. While the black containers and neutral glass gives the structure a simple, easily reproducible form, the silhouette of a golden hen sits on top, individuating its location to Barneveld, 'egg capital' of the Netherlands.



Project Description from NL Architects:

"ProRail, responsible for the railway network in the Netherlands, together with the so called spoorbouwmeester Koen van Velsen (‘the national supervisor for railway architecture’) started a campaign to make waiting more comfortable: Prettig Wachten."


 "Travelers experience waiting on a station as much longer then waiting within a vehicle. Surveys have indicated that waiting time is experienced as 3 times longer than it actually is. In this respect especially small and medium sized stations proof a big challenge. These smaller stations are usually unmanned, desolate, often creating a sense un-safety. What can we do to improve them?"



"The waiting areas of in total twenty stations throughout the country will be upgraded, both functionally and cosmetically: introduction of washrooms, wifi, floor heating, railway TV. Or Art!

One of the keys to the success of Prettig Wachten is to introduce human presence on these stations, to create some sort of informal supervision. An effort is made to create small multifunctional shops. In Wolvega for instance a flower shop will be opened, the florist will also be serving coffee and will even be cleaning the restrooms."



"In Barneveld Noord a bike-repair shop will be included run by people that are ‘differently able’. They will contribute to the maintenance and hopefully prevent the broken window syndrome.

In Barneveld Noord a new station will be build. Well station, perhaps more a bus-stop. But then again, quite an intriguing bus-stop…"



"It is supposed to be a temporary structure. Hence the station will be built out of shipping containers. The containers contain space, but also form space.

They will be combined into an explicit arrangement. Together they form an ambiguous but strong sign. Minimum effort, maximum output."



 "Three containers are ‘suspended’ in the air. Together they form a ‘roof’. One contains the installations, the other storage. The third will be opened at the bottom. It forms the headroom for the enclosed but fully transparent waiting area, creating a double high space."



"The fourth container is flipped to an upright position. It makes an instant tower. The tower contains a clock. And a wind vane. Since Barneveld is the egg capital of the Netherlands — the station is located on the so-called Chicken Line — not the typical rooster will be mounted, but a gilded chicken.













Project Details and Credits:
Project: Barneveld Noord Train station in the framework of Prettig Wachten, 2011, completion 2013
Initiative ‘Prettig Wachten’ and Supervision: Spoorbouwmeester Koen van Velsen / ProRail
Client: ProRail
NL Architects: Pieter Bannenberg, Walter van Dijk, Kamiel Klaasse
Project Architect: Gerbrand van Oostveen
Team: Kirsten Hüsig, Barbara Luns, Gert Jan Machiels and Gen Yamamoto with Aude Robert and Christian Asbo
Consultant: Movares
Contractor: Strukton

The tower holds a lavatory, 11.998mm high, topped by a glass roof. Royal Flush."


Wednesday, February 25, 2015

London Looks To Underground Motorways


Boris Johnson - Mayor of London - Conservative
Assumed office
4 May 2008
replaced Ken Livingstone - Labor   
In office
4 May 2000 – 4 May 2008


An article appeared in Gizomag today about an initiative by London's Mayor for reconstructing a series of London motorways underground.

http://www.gizmag.com/london-underground-roads/36230/

The proposal was announced by Mayor of London Boris Johnson during a recent visit to Boston, US, where a similar project has taken place. The Central Artery-Tunnel Project (nicknamed the "Big Dig") saw Boston's existing six-lane elevated Central Artery replaced with an eight-lane underground highway.

According to the Massachusetts Department of Transportation, the Big Dig was the "largest, most complex, and technologically challenging highway project in the history of the United States." It is said to have significantly reduced congestion, improved the environment and led to regeneration above ground.

The Greater London Authority says that over 70 sites across London have been considered for the potential introduction of tunnels, fly-unders and decking, the renderings for some of which can be viewed in our gallery.

That article mentions:

Among the suggestions, a fly-under has been proposed for the A4 in Hammersmith that would reconnect the town center with the River Thames.

A mini tunnel has been proposed for the east-west A13 in Barking Riverside [in eastern London], meanwhile, on the basis that it could open up a significant amount of land for future development and reconnect parts of the local area.

Decking over a section of the A3 in Tolworth [in south eastern London] would create land for new homes and connect the area adjacent to the new Crossrail station with the rest of the borough.

And the addition of decking or a mini tunnel to the [Intermediate Ring Road] A406 in New Southgate [in northwestern London] would also create space for new homes and connect the surrounding area to the new Crossrail station.

Elsewhere, there is discussion about a potential replacement for the London Inner Ring Road. Johnson believes that an inner orbital tunnel or two cross-city tunnels could help to deliver more efficient and reliable movement of vehicles around the city.

Projects as these include covering existing grade separated motorways, as well as adding new grade separation to existing arterial road segments- with many of London's main roads comprising both motorway and at grade segments.

This builds upon what was published in 2014, such as that regarding the possible London Inner Ring Road replacement- not via a mainline surface route but rather built by drilled tunneling.




http://londonist.com/2014/05/plans-for-a-22-mile-ring-road-beneath-london.php

excerpt

Could London’s traffic problems be fixed by an underground ring-road? ‘Very early stage’ plans that would see a 22-mile subterranean orbital were revealed by the Mayor today.

The Inner Orbital Tunnel is the idea of the independent Roads Task Force, which has been looking at ways to deal with the capital’s increasing traffic. This new scheme would cost an estimated £30 billion to build and would encircle the centre at roughly the Zone 1/2 boundary. Dual-carriageway tunnels would link the Westway in the west to the A12 in the east, two new tunnels would cross the Thames at Wapping and Battersea, and the southern section would pass through the major redevelopment areas of Nine Elms and Elephant and Castle.

The scheme would take thousands of vehicles off the surface roads, potentially reducing both congestion and pollution (it’s not stated, but we’re assuming a major tunnel, a decade or more hence, would employ some kind of carbon capture or pollution scrubbing not possible on a surface road). The freed-up land above could then be developed in various ways, funds from which would help pay for the tunnels.

Deputy Mayor for Transport Isabel Dedring told the Standard: “This is not about creating a motorway through the centre of London. It’s about freeing up capacity on the city surface, improving air quality, and reclaiming space for public parks, pedestrians and cyclists.”

Some further details:

http://www.autocar.co.uk/blogs/motoring/why-londons-motorists-could-be-happy-underground

excerpt

Under the outline plan, the iconic Tower Bridge – currently the eastern border of the congestion charge, and bowing under a huge weight of traffic – would be closed to vehicles. There would be two underground river crossings at Battersea, near Battersea Power Station and Wapping, near Tower Bridge. The A40 Westway flyover near Shepherd’s Bush could even be demolished as part of the scheme. (The A4 flyover at Hammersmith in west London could also be demolished and replaced with a ‘flyunder’).

The plan is a revival of official efforts to construct a modern grade separated motorway network for London, something that had been pursued by more conventional - re- surface - means that included a planned 'London Motorway Box' that had been canceled in 1973.  The new plan is essentially a revival of such via a nearly entirely new design and different means- as a drilled tunnel avoiding the massive surface disruption of a surface mainline route.




The 'London Motorway Box' also known as Ring Road #1 was the innermost of a series of 'Ring Roads' - what we in the USA would call 'Beltways'.



The 'London Motorway Box' as planned by the early 1970s would have been largely elevated, built along existing railroad corridors to reduce building displacement.

An example of such a style of motorway was London's somewhat ironically named 'Westway'.

The irony was that was also the name of New York City's officially proposed in 1974 and canceled in September 1985 project to construct a West Side Highway replacement of a 1920s design elevated viaduct with a largely box tunneled modern replacement within 93 acres of new landfill extending the street grid for new neighborhoods and parkland extending Manhattan island further west by somewhat narrowing the Hudson River.  Though including a northern segment that would have been elevated along the area of the Javits Convention Center, N.Y.'s Westway was condemned for its tunnel-landfill segment despite the area already being industrialized landfill, by 'environmentalists' behaving oblivious to the clear benefits of relocating the vehicular traffic stream into a tunnel.

Yet London's Westway, was rather different.




Such a design doubtlessly influenced the 1973 cancellation of the remaining planned London motorway network, leading to the situation where something serious needs to be done to provide a modern motorway network but in a far more broadly appealing manner.

Such concerns even prior to 1973 had lead to various consideration of providing such by a network of underground roads, then being rejected due to cost considerations, such as this.

In the decades since, technological developments have made such more practical as elucidated in the 1997 book 'Transport in Europe' by Christian Gerondea.

That book discusses advancements in the 'Austrian' method of drilled (moled) tunnel creation, and proposes creating urban motorway networks of two level tunnels that would be additionally cheaper to build because they would provide the necessary height for passenger automobiles and small trucks, but not that for larger trucks, which would allow only a single deck within a comparable diameter such drilled tunnel.

The London proposal makes no mention of such a reduced height design, with its emphasis upon handling traffic including commercial- presumably larger trucks.

Such a design would follow that of Sweden's recently constructed Stockholm Ring Road, which had been temporarily stalled during the latter 1990s due to doctrinaire 'environmentalist' opposition to accommodating a broader mass of vehicular traffic.

Such opposition does face the new London plan, such as that formally from within Islington in northeastern London:

http://www.islingtongazette.co.uk/news/politics/boris_s_30billion_underground_motorway_inappropriate_for_islington_1_3801043?usurv=skip

The scheme, which will cost double that of the Crossrail project, would see a major junction built at Highbury Corner to join the A1 while creating links with Camden and Whitechapel.

When the motorway was announced as part of the GLA’s Infrastructure Plan 2050, the Mayor said it would remove “tens of thousands of cars” from London’s roads and help reduce the huge pollution problem in the city.

But a motion set to be read at full council next Thursday by the town hall’s environment and transport chief Cllr Claudia Webbe brands the scheme “damaging” and “inappropriate”.

It states: “The proposed scheme would be extremely damaging to Islington and is an entirely inappropriate method of addressing the long-term transport infrastructure challenges facing London.”

The council’s executive is set to put forward strong opposition to the underground motorway as part of the consultation on the infrastructure plan, which closes on October 31.





Sunday, January 4, 2015

Old and New: Elevated and Box Tunnel with Minimal Excavation

NYC Manhattan West Side Highway- Old & New
new box tunnel beneath Riverside Drive boulevard extension

Old= Elevated Viaduct

New= Submerged Tunnel Box

Least expensive when done with no or minimal excavation, as respectively with a tunnel box atop the existing SE Freeway segment between 11th Street and Barney Circle- Pennsylvania Avenue SE, and with an extension of that freeway to RFK Stadium.

Washington, D.C. Barney Circle
Existing SE Freeway and immediate unbuilt extension involving no heavy excavation


Tunnel Box atop existing SE Freeway segment between 11th Street and Barney Circle


http://wwwtripwithinthebeltway.blogspot.com/2013/11/wasting-eastern-seeast-leg-freeway.html
http://wwwtripwithinthebeltway.blogspot.com/2014/09/a-se-freeway-plan-benifiting-greatest.html


Friday, January 2, 2015

Bertha Sabotaged?

Ignorant ideology blinded Grist article by David Roberts gloating about the problem with the 'Bertha' TBM fails to mention the actual engineering problem of the machine being blocked by a pipe left by a subcontractor that failed to enter its location into a database- facts gathered from the article's comment section.  



http://grist.org/cities/seattles-unbelievable-transportation-megaproject-fustercluck/








The 'large steel pipe' that broke the tunneling Machine, Bertha, is one reason government should stop using private contractors for every damned thing. We should have used WSDOT folks to do that work. It was there specifically to test to see if the ground could handle a tunnel. It wasn't on the map so the company boring the hole didn't know it was there. If WSDOT had done that work, it would have been on the map. Blame the folks who didn't keep records and pass along the information. Don't blame the tunnel idea.

The vote for the tunnel in Seattle was close. I like the idea of a seaside park the whole length of Downtown Seattle. Many others did too. It will happen.

The viaduct is an eyesore. It also happens that is was, designed and built by the same company with the same materials as the Oakland Freeway that killed a bunch of people during a big earthquake. It needs to come down, yesterday.

I grew up in Chicago where we have a 'surface option' called Lake Shore Drive. It makes it impossible to get to the lake from neighborhoods except every half mile or so where there is an underpass. So much for neighborhood kids playing in the park or walking to the lake shore on a lunch break. A surface option here would make Interstate 5 even more of a clogged mess.

The tunnel is part of State Route 99 which is a 50 mile road from Everett, Washington to Fife. Everett is a huge port town (look up Everett in 1916). It also passes through Tacoma, another huge port town. Where do you think this traffic will end up? What is being suggested by this article is to split this important highway in half. It is bad enough shipping trucks will have to take I-5. To make commuters cram onto the already overwhelmed interstate is plain stupid.







That large steel pipe was installed by WSDOT and failed to put on their maps. The private contractors were relying on information provided by WSDOT gathered during the pre-construction phase that lasted several years for ground even broke. In essence, it was WSDOT's fault unfortunately.

SR 99's importance for freight traffic is minimal since there is no easy access to SR 99 from most of the docks and the Battery Street tunnel restrictions. Most freight traffic funnels on the West Seattle Freeway towards I-5 and beyond. SR 99 is a subpar bypass when Interstate 5 is clogged up though, but that's mainly speaking about the north end around Green Lake where you have to rely on surface streets to make it back to I-5 from SR 99. You don't have that issue with the south end with the SR 599 freeway connection.

SR 99 used to be US Hwy 99 before Interstate 5 took over most of the existing route. But Seattle needs the minimum of two thru-traffic arteries in the area. I would disgress that thru-traffic should go around on I-405, but that freeway is in much FUBAR shape as it's brethren.







Read the article again; "it? Turns out Bertha ran into a large steel pipe that was left there by a WSDOT employee in 2002. Yes, WSDOT killed its own machine. It’s almost poetic. [Correction, 12/16/14:

The steel pipe casing was left in the ground not by a WSDOT employee,
but by a WSDOT-hired contractor. Also, Seattle Tunnel Partners, which
owns Bertha, says the machine broke down due to overheating; neither STP
nor anyone is sure exactly why, or whether the pipe casing is to
blame.]"







It's still ultimately falls on WSDOT to keep their stuff updated. Accountability lies with both the contractor and WSDOT for being the ultimate supervisory organization. STP is still relying on information provided by WSDOT that they did before actual construction occurred.


 -------


http://www.wsdot.wa.gov/Projects/Viaduct/
http://www.wsdot.wa.gov/News/2014/01/99010313.htm
http://www.wsdot.wa.gov/Projects/Viaduct/Contents/Item/Display/1457
http://www.wsdot.wa.gov/News/2014/06/16_detailsofrepairworkplan.htm





Tuesday, February 25, 2014

Birmingham 20/59


an interesting proposal to replace an existing elevated freeway with one below ground, would cost $700 million, which is deemed too expensive by officials choosing instead $400 million elevated reconstruction

Existing 20/59


 Proposed Lowered 20/59

  Proposed Lowered, Partially Covered 20/59

Proposed Lowered Covered 20/59


Saturday, November 23, 2013

Center Loader vs Side Loader Urban Freeway Access Ramps




Critical to a tamed street environment conducive to this air rights development, are center loader access ramps for the freeway- IOW the ramps to or from the freeway have short tunnels to thus not load by the left hand curb but rather from the middle of a frontage-service road.

This center loader design preserves the curbside for lower speed uses, and can be seen in renderings of the proposed Washington, D.C. I-395 redevelopment project just south of Massachusetts Avenue in Washington, D.C.

This design should be a mandatory retrofit for existing urban freeways- at least those built below ground level, as it has been the ramp interface rather than the existence of the mainline freeway itself, that causes the ripple of intimidation for pedestrians and to a degree local vehicular traffic depending upon the design and location of cross-streets.

An example of such as a retro-fit can be found in the recent proposals to construct 'air rights' development atop I-395 (re I-95) in Washington, D.C.

As far as I know, the issue of center rather than side loader freeway access ramps remains unaddressed by transportation planning advocacy organizations, owing to a dogmatic doctrinaire stance against the very concept of urban freeways preventing them from finding let alone appreciating such critically needed design improvements.

Thursday, March 28, 2013

E Groups Throw in the Towel on TPZ

 Nothing from these environmentalist organizations about safeguarding the rail component of the Tappan Zee Bridge corridor.

http://www.lohud.com/article/20130327/news/303270049?source=nletter-top5

Riverkeeper and Scenic Hudson may no longer be enemies of the new Tappan Zee Bridge but the two environmental groups said they are still watchdogs of the massive construction project in the Hudson River.

The former foes of the $3.9-billion undertaking that is expected to bring years of disturbance to the river agreed on today to support the new bridge.

They signed on after the state strengthened its oversight of the project, boosted an environmental mitigation fund and created a special account to help communities near the construction with riverfront improvements.

http://www.riverkeeper.org/tag/tappan-zee-bridge/

By doing so, groups as "Riverkeeper" have surrendered, and can not be rationally seen as protectors of our transport corridors.  Failing to build the design with the structure for the lower deck at a cost of $200 now means having to spend $1 billion or more additional to add such space by a connected or separate structure with the "Honda" style towers infringing upon the median space vertical clearance thereby preventing double stacked rail cars.

Tappan Zee EIS FAILS to Address Lower Deck
 http://cos-mobile.blogspot.com/2012/12/tpz-eis-fails-to-address-lower-deck.html

Monday, December 10, 2012

TPZ Lower Deck Inexplicitly Eliminated


 
The official option #1


a dropped option #4

The newest designs for the replacement Tappan Zee Bridge all feature a single deck- eliminating the previously proposed lower deck.

http://www.newnybridge.com/thruwaybridgedesignpresentation.pdf

http://www.nypost.com/p/news/local/gov_cuomo_unveils_leading_contender_EGapkbrh9WYOJXsNAC3uAP

As I previously reported, I was told that the lower deck design added $200 million to the initial construction costs, which would be far less expensive than the other options of adding such capacity by a parallel structure.  I've yet to see any numbers to even attempt to justify eliminating the lower deck design.

So if we are to ever add passenger and freight rail capacity by such a parallel structure instead costing 5x the amount- for what?  The preferences of a handful of houseowners so concerned about the height?  Have they noticed the artfully done supports of these previous proposals now being replaced by those less graceful than the NJ Turnpike's elevated viaduct section atop the Meadowlands?

Sunday, April 1, 2012

Trump on U.S. Decline


Interview with Donald Trump
Our Infrastructure Paralysis- Portender of Our Ultimate Defeat By China


The U.S. is vital to the Western World, yet is being seriously undermined by its Infrastructure Paralysis

Vital to the U.S. are its major cities, particularly Washington D.C. and New York.

The New York Metropolitan Region is vital.

We need to recognize it- improve the infrastructure particularly the roads.

Yes roads, including railroads and not excluding roads- that is not excluding grade separated highways. We need both. Screw this adversarial shit.

We need to improve the northeastern railroad corridor between Boston and Washington D.C., increasing speeds at least by an additional 75 to 100 mph for 150-220 mph train service better connecting the Boston-New York-Philadelphia-Baltimore-Washington, D.C. super-region, relieving our airports of much of the super shuttle New York to Washington, D.C. flights, and freeing up space for longer flights, while reducing the emissions of higher altitude CO2 emissions to lower level emissions from whatever we burn to generate the electricity, assuming we don’t use some form of nuclear, hydro-power or a better value bio-fuel as Hemp or Algae.

We need to fix the Washington, D.C. interstate highway system- shit if they object, make ‘em a state to justify calling these ‘interstate’ highways- done in a more updated, environmentally friendly way with the maximum use of existing cleared corridors and a heavy use of tunnels or ‘cover-ways’. Just look at my prototype alongside my towers beneath the recently under construction Riverside Drive southern extension. That proves the lie that freeways don’t belong in cities; rather we need more, done in this fashion, as tunnel beneath surface roads. Forcing all of the vehicular traffic upon a single grade is so suburban – thing of ranch houses – and how the now trendy doctrinaire stance against urban freeways pushed through such Jesuitical entities as the “Congress on New Urbanism” which can’t even describe the semi-underground Route 34 Freeway stub in New haven, CT correctly, was applied frequently against urban railroads particularly prior to the project constructing the current Grand Central Terminal in Manhattan, N.Y. and covering over its yards to the rear with new development that ranks amongst the city’s most prestigious area. We can smoothly glide I-95 inside the Beltway as God intended by the conveniently located electrical power transmission line corridor some 250 feet already in width to a cut and cover reconstruction of the Washington D.C. Red Line Northern Railroad, into the proposed Grand Arc as proposed in that feisty Washington, D.C. freeways blog, “A Trip Within The Beltway”, silently alongside Catholic University of America, just as the future West Side Highway Tunnel shall pass quietly beneath Riverside Drive next to my towers, protecting their property values as any such spectacular area must mandate. A Washington, D.C. “Big Dig” -- really no more a discredited *concept* than anything else constructed under shoddy, good old boys’ club (fraternity order) no bid contracting! --  is imperative. Are the new urbainist types who pretend that highway don’t matter, and that an otherwise multilayered urban environment can not possibly extend to grade separation for vehicles (and don’t give a sh*t about road design such as that blinders-wearing 'guru' Jane Jacobs who would rather that highways be environmentally invasive) , would all be okay with such shoody contracting and constructing for light rail and transit oriented real estate development. Jeez.

So are major improvements in and around New York City.

First and foremost (asides from the northeastern corridor high speed rail passing through the area), we NEED that tunnel, the Cross Sound Tunnel, connecting Long Island and Westchester and I-287, proposed by developer since about 2005, and providing the first new link to the island since the completion of the Throgs Neck Bridge in 1961- a fire beneath its mainland bound island onramp in 2009 attesting to the serious need for at additional crossings to and from Long Island, at least to Westchester I-287 and at least an additional crossing to Connecticut, plus one tunneled via the existing LIRR Bay Ridge railroad right of way as an encased tunnelway – existing neighborhoods must have these new highways as ‘cover-ways’ as should places like Catholic University of America and my west side towers – to a new tunnel crossing beneath New York Bay bypassing Staten Island and connecting to I-78 in New Jersey hence way better connecting Newark and JFK airports.

The Cross Sound Tunnel proposal makes perfect sense environmentally. It a deep drilled design, meaning no continuous surface disruption as drilled deep underground, with the plan being for the cut and cover approaches to be constructed with a staging of the lid or roof early during the excavation, minimizing the visible construction footprint while bringing early the benefits of the new parkland. Initially proposed as a triple tube , the center for maintenance and emergency access, it was subsequently proposed with an enlarged center tube to accommodate a potential railway. Indeed its so environmentally sensible that it wastefully diverts to the east of Oyster Bay increasing the length and hence the costs for no apparent reason other than perhaps an overly powerful entity and or interests where a drilled tunnel is insufficient. No period, just as was said in the years leading up to 1973 when Gov. Rockefellor crumbled on the Robert /Moses proposed Cross Sound Bridge.

The Cross Sound Tunnel was about to receive the public endorsement of NY Governor Elliot Spitzer with the announcement of a financing deal with Bear Sterns- read about it in the LI Real Estate Journal. It appears that this was topped by that silly sex scandal they used as the reason or lets be extra frank- excuse they used to stop the tunnel- jesus he was client number nine at an outfit called the ‘emperor’s club’ yet what did we ever get to hear about clients one through eight, and ten?!

What a scam. We need to investigate who were the – lets be extra frank again – assholes, stopping a seriously needed and environmentally friendly transportation link as this. Think about it, anywhere, people had to experience surface road construction, or if tunnel, still much surface disruption during the construction, at least in spots anyway. Here the project is virtually entirely drilled deep moled without the surface disruption. Yet these self indulgent wealthy assholes get to block that- even when weirdly routed out of the way?

Likewise with the neglect of our existing antiquated arterial net as the northern connections into and through the City, the Brooklyn Queens, Major Deegan and Bruckner-Sheridan Expressways.

If I were Governor or President I would do everything to bring these highways up to spec, with full 12 foot lanes, shoulders and some improvement design-wise with the tunnel- just look at the future West Side Highway Tunnel beneath Riverfront Drive alongside – towers. The BQE needs that tunnel recently proposed and now dropped hopefully as a political slant to attract Obama’s attention for some funds.

The Kosciezko Bridge replacement is good though is shy at least a lane or two in each direction, and greater mitigation on the form of covering the BQE is mandated in neighborhoods such as Williamsburg.

And we need to improve the roads to the north, including the lack of a “subway” line to the terminals at LaGuardia Airport; improve the approaches to the Triborough/”RFK” and in the Bronx.

Do something way more useful in this decade for the Bronx and areas within as Mott Haven- that waterfront industrial wastelands area south of Yankee Stadium has tremendous potential with the Deegan Expressway in a new Cincinnati Fort Washington Way open roof tunnel with the roof being concurrent and future real parkland and or real estate development along a waterfront that become more than a localized enclave rather than one such hemmed in by the existing inadequate and divisive 6 lane 1939 vintage spec Triborough approach/Deegan.

Likewise we should ultimately do something about the elevated Bruckner; perhaps underground its northbound direction while maintaining its monumental through the windshield vista southbound upon a prettier viaduct. Also we need a more elegant solution connecting with the Sheridan with air rights development alongside a restored Bronx Riverfront. Ultimately they should extend the Sheridan along or even under 177th Street to connect with the Bronx River Parkway with an extension as once planned to CoOp City, though with much of it encased in cover-way to protect the adjacent neighborhoods and land values. Likewise and more into the future, such an approach could be used for an expressway along and beneath the Bronx River Parkway corridor connecting to a Mt Vernon east-west arterial and ultimately I-87 with a design solution providing greater useable park-space.

But more immediately, we do that we need to uncork the I-95 bottleneck with the premature lane drop at the interchange with the Pelham Parkway by extending the 4th lane at least to the Hutchinson River Parkway with a longer merge lane, or further to Co-Op City, with some minor geometry work. Longer term should have any future work on the I-95 New England Thruway to eventually accommodate the additional lanes through New Rochelle, with the depressed segments further mitigated as cover-ways. Likewise with the Deegan, brought up to date with a minimum of 4 lanes in each direction through the Bronx, with the area around Fordham Avenue and further north particularly as cover-ways to better connect the area regionally and locally.

We need to relieve the Cross Bronx Expressway, starting with a new link connecting the Cross County Parkway via respectively short and long tunnels flanking a new Yonkers-Alpine New Jersey Bridge, with the latter long tunnel connecting to a northern extension of the New Jersey Turnpike

We likewise need to expand east-west rail connectivity- it would be criminal for NYSDOT to abide by building the replacement Tappan Zee without the lower deck featured in one of the two remaining official options under consideration.

Likewise we need additional capacity. To the north by twinning Bear Mountain Bridge with a set of drilled tunnels to supplement that hairy ride on the eastern side. To the south by the new Yonkers-Alpine Bridge, at least two new passenger railroad tunnels into midtown Manhattan, the 4th tube of the Lincoln Tunnel, at least two additional sets of parallel tubes to the Holland Tunnel, plus the new multi-model Cross Harbor I-287/I-78 Highway-Railway Tunnel connecting Brooklyn directly with New Jersey. This is all long overdue.

The political elites alas don’t give a shit, even after 911 which is exceptionally galling.

Look at how NY State officials botched and crumbled the idea of a West Side Highway Tunnel alongside the WTC which at should be designed at least to provide a seemless connection with the Brooklyn Battery and Battey Park Tunnels. Yet NYS DOT never came up with a truly such adequate proposal instead pushing these short assed shallow tunnels precluding a new downtown underground pedestrian concourse, now instead we get a “Freedom Tower” with a trade off of its 20 floors being essentially un-rented space.

Indeed, look how they folded on Westway during the 1980s.

Like it was all an excuse to distract the masses, showing the “progressives” and “environmentalists” as fools.

Likewise with “limited government”/”conservative assholes who identified the great waste of money as Westway but were okay with spending billions for that cigarette market protection racket of a drug war, prisons, courts, “treatment” and other assorted bullshit. ‘Fiscal conservative’ Lew Lerhman was such a Knights of Malta suck up assh*le.

Beware any politicians.  Whether, Knights of Malta, Opus Dei, Phi Crappa whatever college fraternity, or directly rather than indirectly Masonic, such as Al Sharpton, without understanding it as something than mere personal advancement.  It's not good to so neglect our infrastructure life-lines -- which is what roads are.


2012 - April 1 - South Mall Blogger
http://southmallblogger.blogspot.com/2012/04/2012-april-1.html

Wednesday, July 23, 2008

Westway Pay Back: Billions in Wall Street CEO Executives for Revived Westway, 2nd Avenue Subway, etc

Naming Rights For Infrastructure Funders?!

$2.5 billion (1980s estimated cost) Westway Project
$38 billion (2007 alone) Wall Street executive bonuses

Shining Light in Dark Corners

Everyone agrees Wall Street is having a bad year. Why are bonuses still in over the top? Someone must be profiting from the disaster of our economy, someone beyond the invest bank brokers. Someone is making billions selling stocks and equities short. And they are making sure the brokers who help them are rewarded for a job well done. Joe Kennedy did it in the Depression. There have to be hundreds profiting now from our misfortune.

They don’t just make deals on Wall Street. They make myths. And last week Wall Street's myth-making machine was roaring at full throttle — after the news broke that America’s five biggest investment banks will this year shell out a record $38 billion in bonus pay.

These men got these bonuses at a time when their companies lost $74 billion. N.Y. has given much to attract money firms.

How about some organizing for put the public infrastructure back within the mark of architects?

Wall Street could make its mark positively by paying for a revived Westway project in some form or another of an underground park covered West Side Highway.

Some far thinking CEO could be a rightful candidate for having it named after him/her.

Saturday, November 3, 2007

Build a Cross Brooklyn Tunnel

From NYCROADS
by Steve Anderson











Of all the boroughs in New York City, Brooklyn is the least served in limited-access highway mileage vis-à-vis population. Sometime in the future, the Cross Brooklyn Expressway proposal may be resurrected as an Interstate corridor for use by passenger cars and commercial traffic.

The new Cross Brooklyn Expressway should utilize the right-of-way along Conduit Boulevard, Linden Boulevard and the LIRR Bay Ridge branch to the Gowanus Expressway (I-278). This project should be done in conjunction with the conversion (and completion) of the Nassau Expressway into a controlled-access facility, and possibly be integrated with the long-proposed plan for a rail tunnel between Bay Ridge, Brooklyn and Bayonne, New Jersey. Strong consideration should be given to its construction as a tunnel facility. (The Saunders-Herrenknecht proposal for the Tappan Zee and Oyster Bay-Rye tunnels, which calls for dual-level tunnels for vehicular and rail traffic, may serve as a model.)


Adopted from misc.transport.road

If New York City planning were more comprehensive with pursuing environmentally advanced designs for projects combining highways and rail, the discussion for this much needed Cross Bay Rail Tunnel to Brooklyn would include a vehicular link to New Jersey, with an eastern extension across Brooklyn to Kennedy Airport.

Like the Cross Brooklyn Expressway proposals of the 1960's, this would employ the right of way of the LIRR freight tracks. Unlike these earlier proposals, this new highway would be designed to not tower over neighborhoods, nor take lengthy swaths from existing neighborhoods, nor increase localized air pollution, nor even be something that could accurately be said as dividing Brooklyn locally. Rather than building a high viaduct over the railroad, or a below ground roadway lined with new buildings (at the expense of homes), build this Cross Brooklyn Expressway as an encased, multi-level, multi-model road tunnel with electrostatic precipitator filtration technology, built beneath a new linear park for much of its length.


This railroad corridor is wide at its western segment, approximately 250 feet wide with a single rail track, and its eastern segment traverses vast industrial areas. In contrast, the middle segment is only about 80 feet wide, and is immediately abutted by residential areas that may not permit widening. Indeed, this width is too narrow for a conventional expressway layout, thus requiring a multi-level underground facility. This would perhaps entail three separate decks, one deck for expanded passenger and freight rail service, and two decks for each expressway carriageway.

A full underground segment for this narrow middle segment, and the area along Linden Boulevard would be required for noise abatement.

The project should connect directly to a new Cross Harbor Railway/Highway Tunnel to I-78 in New Jersey, with new parallel roadways to at least the New Jersey Turnpike. Such a tunnel is currently planned, inexplicitly only with rail.

It would be perhaps the nation's most needed new evacuation route from a major metropolitan area, with the greatest re-use of existing industrialized right of way.
Cross Brooklyn Expressway right of way tour- Old NYC
Cross Harbor - Cross Brooklyn Tunnel (non-multi-model rail only version)