Tuesday, March 10, 2015

An Example Of The Essence of Pseudo Progressivism

political thinking designed via class envy 
to get people to go against their interests for the sake of the elites

from the comments section of a January 27, 2015 article at Greater, Greater Washington

Frankly, on-street parking should cost (at least) $3,000/year for a permit. It's grossly unfair that the poor and car-free middle-class have to subsidize the car-owning middle-class and wealthy as they occupy massive amounts of public space at below-market prices. - James

Very true! Clearly the answer is to make parking so expensive that the public space is held entirely by the wealthy. That will definitely solve the problem. -  Scoot

Monday, March 9, 2015

Denver I-70 Lower & Cover Project


I-70 reconstruction project, just east of the interchange with I-25
to replace viaduct segment with trench 
between Brighton and Colorado Boulevards
with 2 block long lid between Columbine and Croyton Streets
next to Swansea Elementary School
to reconnect residential areas
and widen I-70 from 6 to 10 lanes, 
matching rebuilt elevated I-70 segment west to Kalamath Street
past the interchange with I-25

Openly supported by Denver Mayor Michael Hancock

Monetary cost: $1.8 billion


 Existing Situation Viaduct

Schematic

Overhead

Isometric Looking West

Isometric Looking West

Isometric Looking East 
with pedestrian bridge at Josephine Street

Further visualizations:

http://www.i-70east.com/visualization_BrightonBlvdInterchange_stills.html

Denver City Council voted 10-3 in favor, Monday April 7, 2014.

Is the one of two segments of I-70 segment in North Denver east of I-25 that bisects a residential area. (The other was reconstructed in its original elevated configuration in order to cross over the South Platte River.)

Project has opposition from those seeking instead to reroute that portion of I-70 to a triangular I-270/I-76 route, which is said to cost more owing to the longer length, and for that same reason, which would plausibly increase VMT.

Opposition is based upon the displacement of some 50 dwellings, plus fears of flooding in a below ground level freeway, along with ideology to push freeways further out of cities rather than better reconcile them via lowering and covering.

IMHO the deck should be longer, adding 2 blocks length upon each end,
making it extend from York to Milwaukee Streets.  It should at least extend further west to Josephine Street, to move its west portal further from the Swansea Elementary School.

Also, they should cantilever it a bit over the outer I-70 lanes.

If current air pollution issues won't allow that, then the lid should be extended about 70 or so feet in each direction, with additional lid segments further out.

Additional lid segments should be accommodated as future additions with the project designed with the necessary support structure, as done with the Cincinnati Fort Washington Way project.

The sheer number of anti comments against a plan featuring an idea that is generally popular of replacing viaduct freeway segments with lowered-covered one, and a look at a map of the I-270/I-76 suggested re-route in the shape of a cap stone may suggest an organized effort by some Masonic faction.

Anti Site (many useful links):
http://unitenorthmetrodenver.com/blog/

Friday, March 6, 2015

Barbara Mikulski & Baltimore Freeways - Past, Present & Future



 

The recent news of Senator Barbara Mikulski announcing her impending retirement, has led me to a few on line discussions about her efforts in stopping or modifying different freeway projects, and by extension, reviewing some of the past planning of the Baltimore Maryland freeways.

Mikulski is perhaps best known for her efforts at stopping the southern-eastern extension of I-83 along the Baltimore waterfront, and the eastern extension of I-70 in western Baltimore through Leakin Park, which was to connect with the stranded east-west trenched freeway formerly designated as I-170 that connects with MLK Boulevard that itself had been once planned as a depressed trench freeway.

Today, I-70, I-83 and I-95 fail to directly connect with each other.


Initially though, all three were meant to connect with 70 and 95 planned to run along the waterfront of the Inner Harbor being intercepted by I-83 from the north- all as elevated designs as featured in the planning in 1960 'Darling' plan.

1960 'Darling' Plan

1960- interchange of 70-83-95

Under that plan, I-83 would have run directly into I-95 south, while I-70 east would have run directly into I-95 north.

 






This had followed earlier planning that had I-70 potentially follow an east west freeway skirting the northern side of the CBD.










 1959

The 1960 'Darling' plan was subsequently followed by the Baltimore "10-D" freeway plan, shown in this 1961 J.E. Greiner Study Report.


A major change in this planning was the deletion of the I-70 segment along the waterfront, having it intercept at a separate interchange than that with I-83 and I-95 along with the deletion of the east west freeway skirting the north side of the CBD.

1962 "10-D" System I-83/I-95 interchange

Opposition to this "10-D" system led to additional modifications of the proposed Baltimore freeway system,, leading to the adaptation of the "3-D" plan.

Two major changes of the "3-A" plan were re-routing I-95 --  away from the Inner Harbor waterfront southward to Fells Point -- and the deletion of the southern extension of I-83 to I-95, replacing that with an extension of I-83 that would turn east along the waterfront -- essentially along the no abandoned I-95 route - to met I-95 further east.


1975 elevated I-83 extension turning east along waterfront

Other changes of the "3-A" plan addressed the down-specing of the north-south connection skirting the eastern side of the CBD.  This included, eliminating the freeway connection between I-83 and the east-west freeway from the west along Franklin and Mulberry Streets that had been planned as I-70; shortening the clearing of the right of way to no longer reach I-83; and building that reduced length corridor not as a depressed freeway, but instead as a surface boulevard subsequently named for Martin Luther King- MLK Boulevard.

Further changes included no longer routing I-70 along the east-west freeway to the MLK corridor, instead renaming that as "I-170" and constructing a southerly continuation of I-70 to connect with I-95 further west.

Another change was the crossing of Gwynn Falls, from the diagonal route through the Rosemont neighborhood, to a route turning south along the west bank of Gwynn Falls before turning northeast along a RR to then meet the Franklin-Mulbery freeway.



10 D northwest diagonal Rosemont and later 3 A southwest diagonal route

"3-A" plan showing I-170 with I-70 connection to I-95

 http://www.roadstothefuture.com/I70-I170-I95-I395.html


I-95 would be built along the southerly route, and not as a bridge as initially proposed but as a set of tunnels- 4 tubes with 2 lanes apiece to avoid blighting Fort McHenry.

An I-395 viaduct would be built connecting I-95 with the southern end of MLK Boulevard.

A 1.4 mile segment of once planned I-70, opened as I-170 as constructed between Franklin and Mulberry Street- always thankfully planned as a trench that could be conceivably eventually covered, rather than an elevated.  This is the highway that today is often referred as Baltimore's so-called "highway to nowhere".

However, the planned I-70 link from the Franklin-Mulberry freeway to existing I-70 near and past the Beltway would be canceled owing to political opposition to its routing through Leakin Park, which by about 1970 had been planned to include one short cut and cover tunnel segment in the side of a hill.  A subsequent plan to only build the segment from the Franklin-Mulberry Street southward to I-95 renamed as I-595 was likewise canceled during the 1980s, with the stub connectors from I-95 later demolished.



With the planning having strangely abandoned the freeway link between I-83 and I-70/I-170 of what would have been an inner Baltimore beltway downscaled to today's MLK Boulevard  - strangely because they had practically cleared such a corridor anyway for such newer buildings as the Cultural Center, needing to only thread a cut and cover tunnel between the Armory and the Hoard Street RR tunnel --  planning instead focused upon the southerly extension of I-83 to I-95.

Because that plan involved adopting essentially the former I-95 route along the Inner Harbor waterfront- thus meeting the objections that had pushed the I-95 route south, it ended up being canceled, despite the substitution of an insufficiently long tunnel segment.




All of this has got me thinking about alternative designs for connecting these freeways best serving their regional roles in the transportation network:

- Connect I-83 with I-95:

Relocate southern I-83 via Tunnel Connection to and beneath the MLK Boulevard Corridor, with I-83 continued southward there as a cut and cover tunnel towards I-395.  Construct northern tunneled segment along-beneath Howard Street and West Mount Royal Avenue- perhaps with a double stacked tunnel to thread between the Howard Street RR Tunnel and the Armory.  This would finally connect I-83 southward to I-95.


- Continue & Connect I-70 to best serve its role as an east-west link:

Build the link from the Franklin-Mulberry Street freeway west to existing I-70, via one of two basic ways:

Modified Leakin Park routing with most of the route within enclosed tunnels.

Lengthen the once proposed Central Ridge tunnel segment to the northwest 4 to 5 times in length.  

Add another such tunnel segment at the South Ridge along Stokes Drive beneath the once proposed recreational facilities- essentially placing the hillside segments within tunnel, before turning east at the Edmondson Avenue corridor.

Connect the two tunneled segments with an arched bridge across the valley portion, perhaps as an enclosed aerial tunnel concealed at the tops of the arches, beneath a bridge-top promenade that would provide spectacular views of Leakin Park for pedestrians and bicyclists.

Such a plan would greatly mitigate I-70 through Leakin Park itself.

However, the transition across Gwynn Fall is more topographically difficult due to its narrow width and shallow depth- meaning that any bridge crossing would have to have raised approaches, or any tunneled crossing descending sufficiently back

A Stokes Drive tunnel would have to provide for I-70 to rise to meet a bridge to cross over Hilton Parkway, or descend - having sufficient length to do so -- to continue as tunnel beneath and past Gwynn Falls. Then, I-70 would continue upon a diagonal route displacing dwellings in the Rosemont neighborhood in the vicinity of Arunah Avenue for about 2 blocks and the south side of one block of Harlem Avenue before meeting the diagonal west end of Franklin Street. If built as a bridge this would require an elevated approach but with cut and cover tunnel construction, this residential area could be subsequently rebuilt. Such a route would run about one block further west than the routing proposed during the 1960s, and could be further mitigated if permitted to temporarily disturb the northern corner of the graveyard along the south side of Edmondson Avenue.  Such a cut and cover route with restoration atop could use such options as #2 or #3 as shown.


Alternatively, a ridge-top I-70 tunnel initially along Stokes Avenue could turn south along the west bank of Gwynn Falls, displacing the existing grade separated section of Hilton Parkway, and so continue on about the route of the latter past planning, with there being sufficient length to facilitate a transition to a cut and cover tunnel crossing beneath the Gwynn Falls stream valley. If carried to the east side of the RR, this route would displace some dwellings at the end of Kinsey Avenue, a one block segment of Ashurton Street and the end of W Fairmont Avenue; if instead carried to the east side of the RR it would require our cut and cover tunnel to temporarily disturb the southern end of the graveyard. Such a cut and cover tunnel would be longer and this more expensive than one through Rosemont, even with reconstruction and generous financial compensation for those in Rosemont.


Edmondson Avenue tunnel with western approach along or paralleling Cooks Lane.

This could be either via cut and cover or TBM drilled-moled tunneling. 

The latter option would have less surface disruption to construct, and could be done with one or two Seattle 'Bertha' sized tubes, with 2 levels with 2 lanes and 1 shoulder apiece for a total of 4 or 8 lanes.

The recent reconstruction/ lowering of the western end of the Franklin-Mulberry freeway, would be ideal for setting up TBM machinery to drill westwards, and definitely provide sufficient space to drill deep enough to cross beneath Gwynn Falls without disturbing the surface much as the Washington, D.C. WMATA Red line passes deep beneath Rock Creek Park.

Because of the economics of such, it may make more sense for it to follow the Edmondson Avenue-Cooks Lane routing, with a demolition and reconstruction of the existing eastern stub of transcontinental I-70.

- Continue I-70 easterly to ultimately connect with I-95 via east-west freeway, skirting the northern side of the CBD:

Construct as through tunnel downtown beneath MLK Avenue before turning north at Madison Street through parking lots and displacing Maryland Attorney General's Office, then wrapping around northwest side of the Armory Building to turn easterly in tunnel beneath East Preston and or West Mount Royal Avenue to a cut and cover tunnel paralleling the existing railroad tunnel beneath Hoffman Street.  At some point east, this east west freeway would transition to an elevated configuration to connect with I-795, I-95 and I-695.  This would provide far superior freeway network spread and thus serviceability than such along the waterfront.

Decommission existing downtown I-83 segment.  Retain its depressed portion as a covered ramp spur connection to a restored street grid, feeding into a wide boulevard via the right of way of the now elevated segment which would be torn down.

- I-83 is better routed to the west via the MLK corridor, and employing existing viaduct now designated as I-395.

- East-west traffic is better served by a connection via I-70 from Franklin-Mulberry that continues easterly via skirting the northern side of the CBD, before connecting to I-895/I-95 and conceivably I-695, providing far greater connectivity into Baltimore region than an Inner Harbor waterfront freeway that would be more redundant with I-95.

For more Baltimore freeway planning history, see:

Scott Kozel:

http://www.roadstothefuture.com/Balt_Early_Expwy_Plan.html

http://www.roadstothefuture.com/Balt_City_Interstates.html

Recent newspaper articles:


https://www.baltimorebrew.com/2011/04/29/the-senator-and-the-highway/

Engineering Reports:

Study for a East West Expressway  City of Baltimore Planning Commission  January 1960 Phillip Darlng Director
http://archives.ubalt.edu/gbc/pdf/14-39-3.pdf

Corridor Development  Baltimore Interstate Highway System 3-A/Segment 10  Urban Design Concept Associates  (Sidmore. Owings & Merrill; J.E. Greiner Company Inc.; Parsons Brinerhoff; Quade & Douglas, Wilber Smith & Associates) December 1970
http://www.baltimorphosis.com/CorridorStudy/CorridorStudy_FM_1970.pdf


Other Sources:

http://digitalcommons.law.umaryland.edu/cgi/viewcontent.cgi?article=1012&context=mlh_pubs

http://www.baltimorphosis.com/


Wednesday, February 25, 2015

London Looks To Underground Motorways


Boris Johnson - Mayor of London - Conservative
Assumed office
4 May 2008
replaced Ken Livingstone - Labor   
In office
4 May 2000 – 4 May 2008


An article appeared in Gizomag today about an initiative by London's Mayor for reconstructing a series of London motorways underground.

http://www.gizmag.com/london-underground-roads/36230/

The proposal was announced by Mayor of London Boris Johnson during a recent visit to Boston, US, where a similar project has taken place. The Central Artery-Tunnel Project (nicknamed the "Big Dig") saw Boston's existing six-lane elevated Central Artery replaced with an eight-lane underground highway.

According to the Massachusetts Department of Transportation, the Big Dig was the "largest, most complex, and technologically challenging highway project in the history of the United States." It is said to have significantly reduced congestion, improved the environment and led to regeneration above ground.

The Greater London Authority says that over 70 sites across London have been considered for the potential introduction of tunnels, fly-unders and decking, the renderings for some of which can be viewed in our gallery.

That article mentions:

Among the suggestions, a fly-under has been proposed for the A4 in Hammersmith that would reconnect the town center with the River Thames.

A mini tunnel has been proposed for the east-west A13 in Barking Riverside [in eastern London], meanwhile, on the basis that it could open up a significant amount of land for future development and reconnect parts of the local area.

Decking over a section of the A3 in Tolworth [in south eastern London] would create land for new homes and connect the area adjacent to the new Crossrail station with the rest of the borough.

And the addition of decking or a mini tunnel to the [Intermediate Ring Road] A406 in New Southgate [in northwestern London] would also create space for new homes and connect the surrounding area to the new Crossrail station.

Elsewhere, there is discussion about a potential replacement for the London Inner Ring Road. Johnson believes that an inner orbital tunnel or two cross-city tunnels could help to deliver more efficient and reliable movement of vehicles around the city.

Projects as these include covering existing grade separated motorways, as well as adding new grade separation to existing arterial road segments- with many of London's main roads comprising both motorway and at grade segments.

This builds upon what was published in 2014, such as that regarding the possible London Inner Ring Road replacement- not via a mainline surface route but rather built by drilled tunneling.




http://londonist.com/2014/05/plans-for-a-22-mile-ring-road-beneath-london.php

excerpt

Could London’s traffic problems be fixed by an underground ring-road? ‘Very early stage’ plans that would see a 22-mile subterranean orbital were revealed by the Mayor today.

The Inner Orbital Tunnel is the idea of the independent Roads Task Force, which has been looking at ways to deal with the capital’s increasing traffic. This new scheme would cost an estimated £30 billion to build and would encircle the centre at roughly the Zone 1/2 boundary. Dual-carriageway tunnels would link the Westway in the west to the A12 in the east, two new tunnels would cross the Thames at Wapping and Battersea, and the southern section would pass through the major redevelopment areas of Nine Elms and Elephant and Castle.

The scheme would take thousands of vehicles off the surface roads, potentially reducing both congestion and pollution (it’s not stated, but we’re assuming a major tunnel, a decade or more hence, would employ some kind of carbon capture or pollution scrubbing not possible on a surface road). The freed-up land above could then be developed in various ways, funds from which would help pay for the tunnels.

Deputy Mayor for Transport Isabel Dedring told the Standard: “This is not about creating a motorway through the centre of London. It’s about freeing up capacity on the city surface, improving air quality, and reclaiming space for public parks, pedestrians and cyclists.”

Some further details:

http://www.autocar.co.uk/blogs/motoring/why-londons-motorists-could-be-happy-underground

excerpt

Under the outline plan, the iconic Tower Bridge – currently the eastern border of the congestion charge, and bowing under a huge weight of traffic – would be closed to vehicles. There would be two underground river crossings at Battersea, near Battersea Power Station and Wapping, near Tower Bridge. The A40 Westway flyover near Shepherd’s Bush could even be demolished as part of the scheme. (The A4 flyover at Hammersmith in west London could also be demolished and replaced with a ‘flyunder’).

The plan is a revival of official efforts to construct a modern grade separated motorway network for London, something that had been pursued by more conventional - re- surface - means that included a planned 'London Motorway Box' that had been canceled in 1973.  The new plan is essentially a revival of such via a nearly entirely new design and different means- as a drilled tunnel avoiding the massive surface disruption of a surface mainline route.




The 'London Motorway Box' also known as Ring Road #1 was the innermost of a series of 'Ring Roads' - what we in the USA would call 'Beltways'.



The 'London Motorway Box' as planned by the early 1970s would have been largely elevated, built along existing railroad corridors to reduce building displacement.

An example of such a style of motorway was London's somewhat ironically named 'Westway'.

The irony was that was also the name of New York City's officially proposed in 1974 and canceled in September 1985 project to construct a West Side Highway replacement of a 1920s design elevated viaduct with a largely box tunneled modern replacement within 93 acres of new landfill extending the street grid for new neighborhoods and parkland extending Manhattan island further west by somewhat narrowing the Hudson River.  Though including a northern segment that would have been elevated along the area of the Javits Convention Center, N.Y.'s Westway was condemned for its tunnel-landfill segment despite the area already being industrialized landfill, by 'environmentalists' behaving oblivious to the clear benefits of relocating the vehicular traffic stream into a tunnel.

Yet London's Westway, was rather different.




Such a design doubtlessly influenced the 1973 cancellation of the remaining planned London motorway network, leading to the situation where something serious needs to be done to provide a modern motorway network but in a far more broadly appealing manner.

Such concerns even prior to 1973 had lead to various consideration of providing such by a network of underground roads, then being rejected due to cost considerations, such as this.

In the decades since, technological developments have made such more practical as elucidated in the 1997 book 'Transport in Europe' by Christian Gerondea.

That book discusses advancements in the 'Austrian' method of drilled (moled) tunnel creation, and proposes creating urban motorway networks of two level tunnels that would be additionally cheaper to build because they would provide the necessary height for passenger automobiles and small trucks, but not that for larger trucks, which would allow only a single deck within a comparable diameter such drilled tunnel.

The London proposal makes no mention of such a reduced height design, with its emphasis upon handling traffic including commercial- presumably larger trucks.

Such a design would follow that of Sweden's recently constructed Stockholm Ring Road, which had been temporarily stalled during the latter 1990s due to doctrinaire 'environmentalist' opposition to accommodating a broader mass of vehicular traffic.

Such opposition does face the new London plan, such as that formally from within Islington in northeastern London:

http://www.islingtongazette.co.uk/news/politics/boris_s_30billion_underground_motorway_inappropriate_for_islington_1_3801043?usurv=skip

The scheme, which will cost double that of the Crossrail project, would see a major junction built at Highbury Corner to join the A1 while creating links with Camden and Whitechapel.

When the motorway was announced as part of the GLA’s Infrastructure Plan 2050, the Mayor said it would remove “tens of thousands of cars” from London’s roads and help reduce the huge pollution problem in the city.

But a motion set to be read at full council next Thursday by the town hall’s environment and transport chief Cllr Claudia Webbe brands the scheme “damaging” and “inappropriate”.

It states: “The proposed scheme would be extremely damaging to Islington and is an entirely inappropriate method of addressing the long-term transport infrastructure challenges facing London.”

The council’s executive is set to put forward strong opposition to the underground motorway as part of the consultation on the infrastructure plan, which closes on October 31.