Tuesday, March 10, 2015

Anti Grade Seperation Dogma Over Common Sense

recent article at Greater, Greater Washington a textbook example of reactionary anti freeway dogma over riding common sense (even hurting pedestrians and cyclists)

http://greatergreaterwashington.org/post/25947/expand-a-highway-to-get-a-sidewalk-how-about-just-build-the-sidewalk/#comments

Dan Reed needs to show the broader picture
showing the proximity with the recently constructed ICC interchange


The GGW article, "Expand a highway to get a sidewalk.  How about just build the sidewalk?"  authored by Dan Reed, creator of the blog Just Up the Pike reports negatively upon MDOT's new project for a segment of MD Route 29 in Fairland, Maryland, about 15 miles northeast of Washington, D.C. involving creating some new walkways/bike paths, the partial closing of an at grade intersection and the replacement of anther with an overpass.

The article is particularly negative about the project's creation of a grade separated interchange for the currently at grade traffic light intersection of Route 29 with Fairland Road for a new overpass the carry the latter (a local road) over the former (a 6 to 8 lane major arterial that's generally a freeway with a few remaining at grade intersections though with most others already replaced with overpasses.

It makes some sense, particularly in noting the elimination of the Musgrove Road crossing of 29, maintaining its access to and from northbound 29 but making it a dead end on the northern side, though failing to bring itself to suggest a new grade separated there- even if only for pedestrians and cyclists!

Likewise it notes the greater development in the suburbia-exurbia creating the 10% increase in vehicular traffic since 2006.

Alas the article hobbles its sensible suggestions with its anti grade seperation dogma.

It notes the need to improve bus service on the 29 corridor though alas without noting the need for greatly improved bus stops- mini stations.

It notes the lack of space for grade separated interchanges, or rather more correctly, those of the sprawling type seen in the suburbs and rural areas further south into Silver Spring and Washington, D.C., which limits the 29 freewayification to the area north of New Hampshire Avenue to I-70.

Yet that ignores the clear advantages of 29 as a full freeway to the north of New Hampshire Avenue for increasing bus line speed over the relatively longer distances to this new development.

And most starkly, the article makes no mention of the proximity of the Route 29/Fairland Road intersection with the recently constructed grade separated interchange with the Inter County Connector Freeway (ICC).  

As if pedestrian safety is served by denying a full grade separated interchange for Fairland Road with such a major grade separated interchange so close by.

Instead the article rests upon dogmatic statements as:

Research shows that building more roads in an effort to cut congestion is actually counterproductive. The roads eventually just fill with more cars as drivers use the new road space to drive more or longer distances than they used to.

That makes no acknowledgment of the greater efficiency of freewayification that the existing lanes can thus carry more traffic.

Would not it be better to advocate improved grade separated crossings for pedestrians and cyclists in addition to automobiles?

Why so much dogmatic negativity rather than a more holistic approach that actually addresses the area in question?

Why not call for a new grade separated interchange for Musgrove Road, as well as Fairland Road, with wider sidewalks than that now proposed for the latter?

Indeed, if one wants to really better connect the area, how about a plan for such new grade separated crossings to ultimately flank a new air rights lid atop 29 for new development, built over time in stages?

An Example Of The Essence of Pseudo Progressivism

political thinking designed via class envy 
to get people to go against their interests for the sake of the elites

from the comments section of a January 27, 2015 article at Greater, Greater Washington

Frankly, on-street parking should cost (at least) $3,000/year for a permit. It's grossly unfair that the poor and car-free middle-class have to subsidize the car-owning middle-class and wealthy as they occupy massive amounts of public space at below-market prices. - James

Very true! Clearly the answer is to make parking so expensive that the public space is held entirely by the wealthy. That will definitely solve the problem. -  Scoot

Monday, March 9, 2015

Denver I-70 Lower & Cover Project


I-70 reconstruction project, just east of the interchange with I-25
to replace viaduct segment with trench 
between Brighton and Colorado Boulevards
with 2 block long lid between Columbine and Croyton Streets
next to Swansea Elementary School
to reconnect residential areas
and widen I-70 from 6 to 10 lanes, 
matching rebuilt elevated I-70 segment west to Kalamath Street
past the interchange with I-25

Openly supported by Denver Mayor Michael Hancock

Monetary cost: $1.8 billion


 Existing Situation Viaduct

Schematic

Overhead

Isometric Looking West

Isometric Looking West

Isometric Looking East 
with pedestrian bridge at Josephine Street

Further visualizations:

http://www.i-70east.com/visualization_BrightonBlvdInterchange_stills.html

Denver City Council voted 10-3 in favor, Monday April 7, 2014.

Is the one of two segments of I-70 segment in North Denver east of I-25 that bisects a residential area. (The other was reconstructed in its original elevated configuration in order to cross over the South Platte River.)

Project has opposition from those seeking instead to reroute that portion of I-70 to a triangular I-270/I-76 route, which is said to cost more owing to the longer length, and for that same reason, which would plausibly increase VMT.

Opposition is based upon the displacement of some 50 dwellings, plus fears of flooding in a below ground level freeway, along with ideology to push freeways further out of cities rather than better reconcile them via lowering and covering.

IMHO the deck should be longer, adding 2 blocks length upon each end,
making it extend from York to Milwaukee Streets.  It should at least extend further west to Josephine Street, to move its west portal further from the Swansea Elementary School.

Also, they should cantilever it a bit over the outer I-70 lanes.

If current air pollution issues won't allow that, then the lid should be extended about 70 or so feet in each direction, with additional lid segments further out.

Additional lid segments should be accommodated as future additions with the project designed with the necessary support structure, as done with the Cincinnati Fort Washington Way project.

The sheer number of anti comments against a plan featuring an idea that is generally popular of replacing viaduct freeway segments with lowered-covered one, and a look at a map of the I-270/I-76 suggested re-route in the shape of a cap stone may suggest an organized effort by some Masonic faction.

Anti Site (many useful links):
http://unitenorthmetrodenver.com/blog/

Friday, March 6, 2015

Barbara Mikulski & Baltimore Freeways - Past, Present & Future



 

The recent news of Senator Barbara Mikulski announcing her impending retirement, has led me to a few on line discussions about her efforts in stopping or modifying different freeway projects, and by extension, reviewing some of the past planning of the Baltimore Maryland freeways.

Mikulski is perhaps best known for her efforts at stopping the southern-eastern extension of I-83 along the Baltimore waterfront, and the eastern extension of I-70 in western Baltimore through Leakin Park, which was to connect with the stranded east-west trenched freeway formerly designated as I-170 that connects with MLK Boulevard that itself had been once planned as a depressed trench freeway.

Today, I-70, I-83 and I-95 fail to directly connect with each other.


Initially though, all three were meant to connect with 70 and 95 planned to run along the waterfront of the Inner Harbor being intercepted by I-83 from the north- all as elevated designs as featured in the planning in 1960 'Darling' plan.

1960 'Darling' Plan

1960- interchange of 70-83-95

Under that plan, I-83 would have run directly into I-95 south, while I-70 east would have run directly into I-95 north.

 






This had followed earlier planning that had I-70 potentially follow an east west freeway skirting the northern side of the CBD.










 1959

The 1960 'Darling' plan was subsequently followed by the Baltimore "10-D" freeway plan, shown in this 1961 J.E. Greiner Study Report.


A major change in this planning was the deletion of the I-70 segment along the waterfront, having it intercept at a separate interchange than that with I-83 and I-95 along with the deletion of the east west freeway skirting the north side of the CBD.

1962 "10-D" System I-83/I-95 interchange

Opposition to this "10-D" system led to additional modifications of the proposed Baltimore freeway system,, leading to the adaptation of the "3-D" plan.

Two major changes of the "3-A" plan were re-routing I-95 --  away from the Inner Harbor waterfront southward to Fells Point -- and the deletion of the southern extension of I-83 to I-95, replacing that with an extension of I-83 that would turn east along the waterfront -- essentially along the no abandoned I-95 route - to met I-95 further east.


1975 elevated I-83 extension turning east along waterfront

Other changes of the "3-A" plan addressed the down-specing of the north-south connection skirting the eastern side of the CBD.  This included, eliminating the freeway connection between I-83 and the east-west freeway from the west along Franklin and Mulberry Streets that had been planned as I-70; shortening the clearing of the right of way to no longer reach I-83; and building that reduced length corridor not as a depressed freeway, but instead as a surface boulevard subsequently named for Martin Luther King- MLK Boulevard.

Further changes included no longer routing I-70 along the east-west freeway to the MLK corridor, instead renaming that as "I-170" and constructing a southerly continuation of I-70 to connect with I-95 further west.

Another change was the crossing of Gwynn Falls, from the diagonal route through the Rosemont neighborhood, to a route turning south along the west bank of Gwynn Falls before turning northeast along a RR to then meet the Franklin-Mulbery freeway.



10 D northwest diagonal Rosemont and later 3 A southwest diagonal route

"3-A" plan showing I-170 with I-70 connection to I-95

 http://www.roadstothefuture.com/I70-I170-I95-I395.html


I-95 would be built along the southerly route, and not as a bridge as initially proposed but as a set of tunnels- 4 tubes with 2 lanes apiece to avoid blighting Fort McHenry.

An I-395 viaduct would be built connecting I-95 with the southern end of MLK Boulevard.

A 1.4 mile segment of once planned I-70, opened as I-170 as constructed between Franklin and Mulberry Street- always thankfully planned as a trench that could be conceivably eventually covered, rather than an elevated.  This is the highway that today is often referred as Baltimore's so-called "highway to nowhere".

However, the planned I-70 link from the Franklin-Mulberry freeway to existing I-70 near and past the Beltway would be canceled owing to political opposition to its routing through Leakin Park, which by about 1970 had been planned to include one short cut and cover tunnel segment in the side of a hill.  A subsequent plan to only build the segment from the Franklin-Mulberry Street southward to I-95 renamed as I-595 was likewise canceled during the 1980s, with the stub connectors from I-95 later demolished.



With the planning having strangely abandoned the freeway link between I-83 and I-70/I-170 of what would have been an inner Baltimore beltway downscaled to today's MLK Boulevard  - strangely because they had practically cleared such a corridor anyway for such newer buildings as the Cultural Center, needing to only thread a cut and cover tunnel between the Armory and the Hoard Street RR tunnel --  planning instead focused upon the southerly extension of I-83 to I-95.

Because that plan involved adopting essentially the former I-95 route along the Inner Harbor waterfront- thus meeting the objections that had pushed the I-95 route south, it ended up being canceled, despite the substitution of an insufficiently long tunnel segment.




All of this has got me thinking about alternative designs for connecting these freeways best serving their regional roles in the transportation network:

- Connect I-83 with I-95:

Relocate southern I-83 via Tunnel Connection to and beneath the MLK Boulevard Corridor, with I-83 continued southward there as a cut and cover tunnel towards I-395.  Construct northern tunneled segment along-beneath Howard Street and West Mount Royal Avenue- perhaps with a double stacked tunnel to thread between the Howard Street RR Tunnel and the Armory.  This would finally connect I-83 southward to I-95.


- Continue & Connect I-70 to best serve its role as an east-west link:

Build the link from the Franklin-Mulberry Street freeway west to existing I-70, via one of two basic ways:

Modified Leakin Park routing with most of the route within enclosed tunnels.

Lengthen the once proposed Central Ridge tunnel segment to the northwest 4 to 5 times in length.  

Add another such tunnel segment at the South Ridge along Stokes Drive beneath the once proposed recreational facilities- essentially placing the hillside segments within tunnel, before turning east at the Edmondson Avenue corridor.

Connect the two tunneled segments with an arched bridge across the valley portion, perhaps as an enclosed aerial tunnel concealed at the tops of the arches, beneath a bridge-top promenade that would provide spectacular views of Leakin Park for pedestrians and bicyclists.

Such a plan would greatly mitigate I-70 through Leakin Park itself.

However, the transition across Gwynn Fall is more topographically difficult due to its narrow width and shallow depth- meaning that any bridge crossing would have to have raised approaches, or any tunneled crossing descending sufficiently back

A Stokes Drive tunnel would have to provide for I-70 to rise to meet a bridge to cross over Hilton Parkway, or descend - having sufficient length to do so -- to continue as tunnel beneath and past Gwynn Falls. Then, I-70 would continue upon a diagonal route displacing dwellings in the Rosemont neighborhood in the vicinity of Arunah Avenue for about 2 blocks and the south side of one block of Harlem Avenue before meeting the diagonal west end of Franklin Street. If built as a bridge this would require an elevated approach but with cut and cover tunnel construction, this residential area could be subsequently rebuilt. Such a route would run about one block further west than the routing proposed during the 1960s, and could be further mitigated if permitted to temporarily disturb the northern corner of the graveyard along the south side of Edmondson Avenue.  Such a cut and cover route with restoration atop could use such options as #2 or #3 as shown.


Alternatively, a ridge-top I-70 tunnel initially along Stokes Avenue could turn south along the west bank of Gwynn Falls, displacing the existing grade separated section of Hilton Parkway, and so continue on about the route of the latter past planning, with there being sufficient length to facilitate a transition to a cut and cover tunnel crossing beneath the Gwynn Falls stream valley. If carried to the east side of the RR, this route would displace some dwellings at the end of Kinsey Avenue, a one block segment of Ashurton Street and the end of W Fairmont Avenue; if instead carried to the east side of the RR it would require our cut and cover tunnel to temporarily disturb the southern end of the graveyard. Such a cut and cover tunnel would be longer and this more expensive than one through Rosemont, even with reconstruction and generous financial compensation for those in Rosemont.


Edmondson Avenue tunnel with western approach along or paralleling Cooks Lane.

This could be either via cut and cover or TBM drilled-moled tunneling. 

The latter option would have less surface disruption to construct, and could be done with one or two Seattle 'Bertha' sized tubes, with 2 levels with 2 lanes and 1 shoulder apiece for a total of 4 or 8 lanes.

The recent reconstruction/ lowering of the western end of the Franklin-Mulberry freeway, would be ideal for setting up TBM machinery to drill westwards, and definitely provide sufficient space to drill deep enough to cross beneath Gwynn Falls without disturbing the surface much as the Washington, D.C. WMATA Red line passes deep beneath Rock Creek Park.

Because of the economics of such, it may make more sense for it to follow the Edmondson Avenue-Cooks Lane routing, with a demolition and reconstruction of the existing eastern stub of transcontinental I-70.

- Continue I-70 easterly to ultimately connect with I-95 via east-west freeway, skirting the northern side of the CBD:

Construct as through tunnel downtown beneath MLK Avenue before turning north at Madison Street through parking lots and displacing Maryland Attorney General's Office, then wrapping around northwest side of the Armory Building to turn easterly in tunnel beneath East Preston and or West Mount Royal Avenue to a cut and cover tunnel paralleling the existing railroad tunnel beneath Hoffman Street.  At some point east, this east west freeway would transition to an elevated configuration to connect with I-795, I-95 and I-695.  This would provide far superior freeway network spread and thus serviceability than such along the waterfront.

Decommission existing downtown I-83 segment.  Retain its depressed portion as a covered ramp spur connection to a restored street grid, feeding into a wide boulevard via the right of way of the now elevated segment which would be torn down.

- I-83 is better routed to the west via the MLK corridor, and employing existing viaduct now designated as I-395.

- East-west traffic is better served by a connection via I-70 from Franklin-Mulberry that continues easterly via skirting the northern side of the CBD, before connecting to I-895/I-95 and conceivably I-695, providing far greater connectivity into Baltimore region than an Inner Harbor waterfront freeway that would be more redundant with I-95.

For more Baltimore freeway planning history, see:

Scott Kozel:

http://www.roadstothefuture.com/Balt_Early_Expwy_Plan.html

http://www.roadstothefuture.com/Balt_City_Interstates.html

Recent newspaper articles:


https://www.baltimorebrew.com/2011/04/29/the-senator-and-the-highway/

Engineering Reports:

Study for a East West Expressway  City of Baltimore Planning Commission  January 1960 Phillip Darlng Director
http://archives.ubalt.edu/gbc/pdf/14-39-3.pdf

Corridor Development  Baltimore Interstate Highway System 3-A/Segment 10  Urban Design Concept Associates  (Sidmore. Owings & Merrill; J.E. Greiner Company Inc.; Parsons Brinerhoff; Quade & Douglas, Wilber Smith & Associates) December 1970
http://www.baltimorphosis.com/CorridorStudy/CorridorStudy_FM_1970.pdf


Other Sources:

http://digitalcommons.law.umaryland.edu/cgi/viewcontent.cgi?article=1012&context=mlh_pubs

http://www.baltimorphosis.com/