Showing posts with label Deegan Expressway. Show all posts
Showing posts with label Deegan Expressway. Show all posts

Wednesday, May 1, 2024

Upstate Access Evacuation Route(s) Clearview Tunnel/I-684/I-687/NYWB & Catskills Express further pondered

 

 

1- the Clearview Expressway extension MUST be a cut and cover tunnel. 

 

But not at the expense of creating a chasm at its northern end, immediately south of the interchange with the Grand Central Parkway (do note the topography, how it drops to the south).

 

To do it right, we MUST re-excavate the southernmost 1/3 of a mile or so of the EXISTING Clearview, and do so with a plan to completely remove and replace the Clearview-Grand Central Parkway interchange, best with a overpass design mimicking the previous multi arched GCP bridge/overpass.

 

And that means shutting down the Cleaview south of Union Pike, with the possible exception of maintaining a eastbound GCP to northbound Clearview through the reconstruction.

 

Clearly this Tunneled reconstruction and extension would continue south before turning to parallel Hempstead Avenue before turning south at Belmont Park to parallel the Cross Island Parkway, flanking each side, until the interchange (retained) with the Southern State Parkway, before its northbound lanes emerge further south with the northbound lanes immediately to the west.  Eminent domain is required, so we have the space later to bury CIP/Belt, with at a minimum 3.5 x fair market value, for a high capacity, cut and cover mixed use interstate expressway.

 

Notably though (and quite sadly), the planning authorities erected a "UBS" Arena, directly in the path, complicating this, and best in need of demolition, as far as I can see.  This UBS Arena was erected only as recently as 2019-2021, and represents the sadly typical contempt of road planning by the authorities & their associated elites.



2- We need a more capacious as well as STURDIER Throggs Neck Bridge crossing.

 

Lets see the development of plans for a pair of 8 lane bridges ideally, with sturdy, stocky legs more able to withstand a tsunami.  Our security demand absolutely nothing less.

 

 3- We must have a separate new crossing to the west.  Namely a pair of new road bridges perhaps mimicking the classic style of the Hells Gate RR Bridge.  Connect this to the south via a new Inter borough Expressway Park Covered Cut and Cover Tunnel.  Do it together with the, not "Bi" Borough, but rather a Borough (or even a Quad Borough with a bridge or tunnel to Staten Island as long anticipated. Reconnect the former NYW&B, removing the apartment/condo buildings foolishly placed upon it right of way to the north of 177th Street) IRT line.  

 

Reconstruct the entire lower Bruckner, (along with the lower Deegan expanded from 6 to 8 through lanes), removing that disgusting elevated monstrosity flanked by new higher capacity cut and cover tunnels.  Restore the NYWB stations, widen and tunnel lid the land segment foolishly converted to a "boulevard", and construct an 8 lane tunnel extending north, northeasterly beneath the Zoo, perhaps with a long bored tunnel paralleling the Bronx River Parkway north to the Sprain and or I-87, and 4 to 6 lanes along Route 1 likewise as tunnel, to join with the new North Central Road Tunnel along the west side of the restored NYWB.  Construct an aerial tunnel with wooden planks atop without heavy soil, and continue it northward to Webster Avenue to enter the Wykagil Bathtub, with a split with the start of a new route I-687 as previously discussed in this blog.  Have it cross over Pine Brook Boulevard in an aerial tunnel with a soil roof for new recreation space, crossing under Weaver Street and arcing northward behind the Quaker Ridge School. continuing north in new linear park tunnel aligned with that existing to the north, displacing and replacing the Heathecote School building and continuing paralleling the Heathecote Bypass before arcing to parallel the 4 lane Mamaroneck Avenue and connect with an all new I-684 interchange.


Additionally, reconstruct the lower Deegan, expanded from 6 to 8 through lanes with full left and right shoulders, removing that ridiculous new building along the waterfront south of Yankee Stadium to construct a pair of cut and cover Deegan expressway tunnels as I posted in this blog back in November 2009.

 

And be sure to prevent any further such development, as I exposed, being pushed by the usual astroturf front organizations pimping for some shadowy network of elites hell bent upon stymieing an improved design road system.







Monday, February 15, 2016

Re-Think New York City La Guardia Airport Expansion Into The South Bronx Proposal

An intriguing idea to expand La Guardia Airport with expanded runways achieved by new landfill displacing Rikers Island, with a new set of entryways in the Port Morris area of the South Bronx, accompanied by upgrades to the passenger rail system- all well and good.







Would establish new supplemental entryway to La Guardia in the South Bronx, thus traffic from the north would no longer need to cross the Triborough or Whitestone Bridges, with access to the rest of the airport via a dedicated rail loop

 
 Would expand runway capacity via new landfill displacing Rikers Island


 Would connect with all three northern radial Metro North Railroads, thus travellers from the north could arrive by any of the three Metro North railroad lines.   
The train station would include a new stop for Amtrak.

Includes the idea of a new convention center replacing Javits Center.

That's an idea that builds upon late 1800s and early 1900s planning proposals to develop this Port Morris area, such as an 1883 proposal for a new convention center, and latter with the idea of continuing the denser development seen in Manhattan further forth, for which the New York, Westchester & Boston railroad, which opened in 1911 had anticipated.



The Re-Think NYC site notes:

The area north of the convention center would be built at an urban scale.  To the west is the Bruckner Expressway, which prevents connection between Port Morris and neighborhoods to the west.  We would bridge this divide through a proposed new "ambassador" building on the west side of the Bruckner at 142nd Street, which would allow people to enter on that side of the expressway, but the building would also serve as a bridge over the Bruckner that would connect to the entire complex.

This proposal needs further work regarding the highway network, particularly as the Bruckner segment along this area is an unsightly elevated freeway- hence placing a building atop it in this configuration would be ungainly.


Should ultimately include a complete replacement-reconstruction of the southern Bruckner Expressway- an unsightly elevated highway.



What To Do About The Bruckner Expressway:

This elevated freeway, with 3 lanes in each direction is unsightly, locally divisive, lacks shoulders, lacks access ramps to this proposed airport entryway complex, and is under-capacity for accepting traffic from the northbound Willis Avenue Bridge from Manhattan.

It does provide a fantastic view through the windshield for travellers heading south.

To the west it is paralleled by a 4 lane wide southbound surface Bruckner Boulevard.

To its east it is paralleled by a 2 lane wide northbound Bruckner Boulevard with buildings, from its southern end to 142nd Street, where the railroad then meets it to run immediately alongside.  That railroad is at a lower grade.

Ideally there should be a new line of buildings designed to reconnect Port Morris with the neighborhoods to the west in the place now occupied by the elevated freeway structure, which should be torn down, with new parallel freeway roadways, with either both directions within new cut and cover tunnel(s), or with the northbound direction in a new cut and cover tunnel, and the southbound direction elevated as the roof of a new line of buildings.

Because the existing elevated freeway must remain in operation throughout the construction project, the first stage would be constructing a new cut and cover freeway tunnel beneath the surface road to the west.

As the Re-Think NYC proposal envisions demolishing the buildings already along the Bruckner's eastern (northbound) side, it could likewise construct a cut and cover tunnelway there as well.  To the north of 142nd Street, this could be done via the existing railroad right of way with the tracks relocated eastward, and with this rail corridor planned to be decked over.  The historic New York, Westchester & Boston RailRoad Station at the north side of Hunts Point Avenue should not be demolished but rather propped up with new supports and retained either in its exact same location or slightly re-indexed eastwards.





Each of these cut and cover tunnels should ideally be at least the of 4 full width lanes plus shoulders.  This might involve some building removal on a brief section of the north side in addition to that one the south side already envisioned by the Re-Think NYC proposal.  This should likewise be designed to tie into the existing 4 lane short tunnel for Bruckner Boulevard traffic beneath the Bruckner Expressway-Deegan Expressway interchange with the approach to the Triborough "RFK" Bridge.  That tunnel should be lengthened both to the south-west to Brown Place, with local street access and a gentler curve displacing the gasoline station there.  And it should be extended to the north-east, with at least one full lane joining into and continuing via an additional lane of the reconstructed Bruckner Expressway.

Once the new cut and cover tunnels are in place, the elevated Bruckner should be demolished, and replaced with a line of new buildings.  Optional would be the idea of an elevated roadway upon its roof; as the purpose of that would be to continue the tradition of the southbound vista through the windshield, this might done only for the southbound direction.  A variation of this would be to have an arial tunnel within one of this structure's upper levels, ala the "Choppway" proposal a few years ago for the replacement of Seattle Washington's elevated double decked Route 99 Freeway.




However, because of the need to retain the existing elevated freeway throughout the reconstruction, this project would have to include at least one cut and cover tunnel on one or both sides of the existing structure- a basic design configuration furthermore favored by the practicalities of establishing on ramp and off ramp access.   Also, the construction could be staged to add an additional cut and cover carriageway between the two new outboard tunnelways once the existing elevated Bruckner is removed.

To the north, the new cut and covers could do wonders for removing the blight of the existing roadways at the mouth of the Bronx River, for both the continuation of the Bruckner and for its connections to the Sheridan.  

Such a cut and cover tunnel Bruckner Expressway reconstruction should extend to Boynton Avenue, thus eliminating the elevated berm segment to the west, meeting the existing Bruckner corridor where the freeway is at ground level, and has the option of transitioning to the service roads to access the Bronx River Parkway.

Such a cut and cover connection for the Sheridan should extend to Westchester Avenue, which is build-able via re-indexing the adjacent railroad to the east.  Further north, portions of the Sheridan should be decked over taking advantage of the topography of the hill to its west to better connect that area with the Bronx River waterfront, such as between E 172 and 173rd Streets.

The new Bruckner Expressway would of course have greater capacity than the existing 3 lane in each direction facility.  The new set of outboard cut and cover tunnels with 4 lanes apiece flanking an inner set with 2 lanes per direction built after the demolition of the elevated structure would provide an upwards of12 lanes, thereby accommodating continuous on lanes for traffic from the northbound Willis Bridge and to and from the new airport access ramps.  Of this, 8 lane would continue to surface at Boynton Street, with a lane apiece to and from the service roads, the remaining 6 lanes with the 6 lane surface Bruckner Expressway, and 4 lanes to the north for the Sheridan.  Providing this extra capacity would allow more traffic to be underground, thus allowing for a more pedestrian friendly Bruckner Boulevard.

With this thought, the project should include such ramp connects into the Hunts Point Market.

Other Ideas:

With the additional of such a significant amount of landfill displacing Rikers Island, another idea comes to mind- what about taking advantage of that to create new roadway crossings between the Bronx and Queens?  

With the Triborough "RFK" Bridge heavily used, even though the "Re-Think NYC" plan would divert some of its traffic by no longer requiring its use from the north to access La Guardia Airport, it would be prudent for long term planning to ultimately seize the opportunity provided by the landfill for the new runway space.

Regarding highways, two ideas come to mind:

- extending the Bronx River Parkway

- extending the Deegan

The logical place would be the area of the Grand Central Parkway-Brooklyn Queens Expressway interchanges.  

Not simply as the junction of these two highways, both of which are heavily used.  

But because that's the location of a rail corridor that has already been studied and proposed as the location of a new interstate highway running roughly north-south between the two roughly parallel highways of the BQE and the Van Wick Expressway.  As planned during the 1960s it was to be known as the Interboro Expressway, and would connect directly with  the contemporaneously planned Cross Brooklyn Expressway.

For a good historic overview of the previous planing for the Interboro Expressway, see the account by NYC Roads Steve Anderson:

http://www.nycroads.com/roads/queens-interboro/

Accordingly it was canceled by 1973.  As planned during the late 1960s-early 1970s it would have included reconstructing a portion of the existing elevated IRT as a subway with the below ground level freeway.  As I have not seen any detailed plans, I don't know if any of the latter planning included any segments as coverways (cut and cover tunnels), rather than simply as an open depressed freeway.

A revival of the Interboro Expressway has been proposed by Peter Samuel's via his publication TollRoads.

As it is a relatively narrow railroad corridor that is generally below grand level, passing through residential area, it would have to be constructed primarily within a tunnel box, and covered with new linear parkland.


Connecting with a Cross Brooklyn Expressway likewise built primarily by tunnelways, this Interboro Route would provide a valuable link into Brooklyn and towards Staten Island and Long Island.



A could be connected to the Bronx by a curved tunnel contained beneath the Re-Think NYC La Guardia Port Morris facility, directly into the Deegan.  Optionally that could include ramp connects to and from the new Bruckner and the Hunts Point Market.

A tunneled extension of the Bronx River Parkway could connect with the BQE-Interboro-Grand Central Parkway, though its logical connection with the latter as a parkway would be best done in conjunction with a demolition-reconstruction of the western portion of the existing La Guardia complex, owing to the geometry.

Such a connection would thus establish a seem-less link between the southern end of New York's longest Parkway -- the Bronx River - Sprain Brook - Taconic which are all really one freeway from the South Bronx towards Albany -- and the Grand Central - Cross Island - Northern State Parkways.

None of these projects would have to be all built at once or together.

Rather they could be built in stages, starting with the incorporation of their initial segments within the "Re-Think NYC" La Guardia expansion project, and within the reconstruction of the adjoining Bruckner.

Including the tunnel box within the new clearing and landfill would be comparably easy compared to failing to plan them and adding later.  As these would be additions between the existing 8 lane Triborough/"RFK" and 6 lane Whitestone Bridges, they could suffice with a minimum of 2 lanes in each direction apiece.

The Deegan-Interboro Connection would provide a valuable bypass of the Triborough "RFK" Bridge and its antiquated Queens approach.  Of course the Deegan should be rebuilt to full 8 lane specifications, as I have previously written about, and its east west segment from Willis Avenue to at least towards Brown Street, should be decked over.  Serious consideration should be given to reconstructing this freeway further to the east at a lower elevation to be likewise decked over as far as practical for connecting with the Triborough"RFK" Bridge, with new parkland atop, more consistent with the spirit of the 1883 Port Morris planning.

Because of their use of the footprint of the La Guardia expansion project, most of this new tunnel crossing construction would not disturb existing neighborhoods nor traffic.
 

Sunday, April 1, 2012

Trump on U.S. Decline


Interview with Donald Trump
Our Infrastructure Paralysis- Portender of Our Ultimate Defeat By China


The U.S. is vital to the Western World, yet is being seriously undermined by its Infrastructure Paralysis

Vital to the U.S. are its major cities, particularly Washington D.C. and New York.

The New York Metropolitan Region is vital.

We need to recognize it- improve the infrastructure particularly the roads.

Yes roads, including railroads and not excluding roads- that is not excluding grade separated highways. We need both. Screw this adversarial shit.

We need to improve the northeastern railroad corridor between Boston and Washington D.C., increasing speeds at least by an additional 75 to 100 mph for 150-220 mph train service better connecting the Boston-New York-Philadelphia-Baltimore-Washington, D.C. super-region, relieving our airports of much of the super shuttle New York to Washington, D.C. flights, and freeing up space for longer flights, while reducing the emissions of higher altitude CO2 emissions to lower level emissions from whatever we burn to generate the electricity, assuming we don’t use some form of nuclear, hydro-power or a better value bio-fuel as Hemp or Algae.

We need to fix the Washington, D.C. interstate highway system- shit if they object, make ‘em a state to justify calling these ‘interstate’ highways- done in a more updated, environmentally friendly way with the maximum use of existing cleared corridors and a heavy use of tunnels or ‘cover-ways’. Just look at my prototype alongside my towers beneath the recently under construction Riverside Drive southern extension. That proves the lie that freeways don’t belong in cities; rather we need more, done in this fashion, as tunnel beneath surface roads. Forcing all of the vehicular traffic upon a single grade is so suburban – thing of ranch houses – and how the now trendy doctrinaire stance against urban freeways pushed through such Jesuitical entities as the “Congress on New Urbanism” which can’t even describe the semi-underground Route 34 Freeway stub in New haven, CT correctly, was applied frequently against urban railroads particularly prior to the project constructing the current Grand Central Terminal in Manhattan, N.Y. and covering over its yards to the rear with new development that ranks amongst the city’s most prestigious area. We can smoothly glide I-95 inside the Beltway as God intended by the conveniently located electrical power transmission line corridor some 250 feet already in width to a cut and cover reconstruction of the Washington D.C. Red Line Northern Railroad, into the proposed Grand Arc as proposed in that feisty Washington, D.C. freeways blog, “A Trip Within The Beltway”, silently alongside Catholic University of America, just as the future West Side Highway Tunnel shall pass quietly beneath Riverside Drive next to my towers, protecting their property values as any such spectacular area must mandate. A Washington, D.C. “Big Dig” -- really no more a discredited *concept* than anything else constructed under shoddy, good old boys’ club (fraternity order) no bid contracting! --  is imperative. Are the new urbainist types who pretend that highway don’t matter, and that an otherwise multilayered urban environment can not possibly extend to grade separation for vehicles (and don’t give a sh*t about road design such as that blinders-wearing 'guru' Jane Jacobs who would rather that highways be environmentally invasive) , would all be okay with such shoody contracting and constructing for light rail and transit oriented real estate development. Jeez.

So are major improvements in and around New York City.

First and foremost (asides from the northeastern corridor high speed rail passing through the area), we NEED that tunnel, the Cross Sound Tunnel, connecting Long Island and Westchester and I-287, proposed by developer since about 2005, and providing the first new link to the island since the completion of the Throgs Neck Bridge in 1961- a fire beneath its mainland bound island onramp in 2009 attesting to the serious need for at additional crossings to and from Long Island, at least to Westchester I-287 and at least an additional crossing to Connecticut, plus one tunneled via the existing LIRR Bay Ridge railroad right of way as an encased tunnelway – existing neighborhoods must have these new highways as ‘cover-ways’ as should places like Catholic University of America and my west side towers – to a new tunnel crossing beneath New York Bay bypassing Staten Island and connecting to I-78 in New Jersey hence way better connecting Newark and JFK airports.

The Cross Sound Tunnel proposal makes perfect sense environmentally. It a deep drilled design, meaning no continuous surface disruption as drilled deep underground, with the plan being for the cut and cover approaches to be constructed with a staging of the lid or roof early during the excavation, minimizing the visible construction footprint while bringing early the benefits of the new parkland. Initially proposed as a triple tube , the center for maintenance and emergency access, it was subsequently proposed with an enlarged center tube to accommodate a potential railway. Indeed its so environmentally sensible that it wastefully diverts to the east of Oyster Bay increasing the length and hence the costs for no apparent reason other than perhaps an overly powerful entity and or interests where a drilled tunnel is insufficient. No period, just as was said in the years leading up to 1973 when Gov. Rockefellor crumbled on the Robert /Moses proposed Cross Sound Bridge.

The Cross Sound Tunnel was about to receive the public endorsement of NY Governor Elliot Spitzer with the announcement of a financing deal with Bear Sterns- read about it in the LI Real Estate Journal. It appears that this was topped by that silly sex scandal they used as the reason or lets be extra frank- excuse they used to stop the tunnel- jesus he was client number nine at an outfit called the ‘emperor’s club’ yet what did we ever get to hear about clients one through eight, and ten?!

What a scam. We need to investigate who were the – lets be extra frank again – assholes, stopping a seriously needed and environmentally friendly transportation link as this. Think about it, anywhere, people had to experience surface road construction, or if tunnel, still much surface disruption during the construction, at least in spots anyway. Here the project is virtually entirely drilled deep moled without the surface disruption. Yet these self indulgent wealthy assholes get to block that- even when weirdly routed out of the way?

Likewise with the neglect of our existing antiquated arterial net as the northern connections into and through the City, the Brooklyn Queens, Major Deegan and Bruckner-Sheridan Expressways.

If I were Governor or President I would do everything to bring these highways up to spec, with full 12 foot lanes, shoulders and some improvement design-wise with the tunnel- just look at the future West Side Highway Tunnel beneath Riverfront Drive alongside – towers. The BQE needs that tunnel recently proposed and now dropped hopefully as a political slant to attract Obama’s attention for some funds.

The Kosciezko Bridge replacement is good though is shy at least a lane or two in each direction, and greater mitigation on the form of covering the BQE is mandated in neighborhoods such as Williamsburg.

And we need to improve the roads to the north, including the lack of a “subway” line to the terminals at LaGuardia Airport; improve the approaches to the Triborough/”RFK” and in the Bronx.

Do something way more useful in this decade for the Bronx and areas within as Mott Haven- that waterfront industrial wastelands area south of Yankee Stadium has tremendous potential with the Deegan Expressway in a new Cincinnati Fort Washington Way open roof tunnel with the roof being concurrent and future real parkland and or real estate development along a waterfront that become more than a localized enclave rather than one such hemmed in by the existing inadequate and divisive 6 lane 1939 vintage spec Triborough approach/Deegan.

Likewise we should ultimately do something about the elevated Bruckner; perhaps underground its northbound direction while maintaining its monumental through the windshield vista southbound upon a prettier viaduct. Also we need a more elegant solution connecting with the Sheridan with air rights development alongside a restored Bronx Riverfront. Ultimately they should extend the Sheridan along or even under 177th Street to connect with the Bronx River Parkway with an extension as once planned to CoOp City, though with much of it encased in cover-way to protect the adjacent neighborhoods and land values. Likewise and more into the future, such an approach could be used for an expressway along and beneath the Bronx River Parkway corridor connecting to a Mt Vernon east-west arterial and ultimately I-87 with a design solution providing greater useable park-space.

But more immediately, we do that we need to uncork the I-95 bottleneck with the premature lane drop at the interchange with the Pelham Parkway by extending the 4th lane at least to the Hutchinson River Parkway with a longer merge lane, or further to Co-Op City, with some minor geometry work. Longer term should have any future work on the I-95 New England Thruway to eventually accommodate the additional lanes through New Rochelle, with the depressed segments further mitigated as cover-ways. Likewise with the Deegan, brought up to date with a minimum of 4 lanes in each direction through the Bronx, with the area around Fordham Avenue and further north particularly as cover-ways to better connect the area regionally and locally.

We need to relieve the Cross Bronx Expressway, starting with a new link connecting the Cross County Parkway via respectively short and long tunnels flanking a new Yonkers-Alpine New Jersey Bridge, with the latter long tunnel connecting to a northern extension of the New Jersey Turnpike

We likewise need to expand east-west rail connectivity- it would be criminal for NYSDOT to abide by building the replacement Tappan Zee without the lower deck featured in one of the two remaining official options under consideration.

Likewise we need additional capacity. To the north by twinning Bear Mountain Bridge with a set of drilled tunnels to supplement that hairy ride on the eastern side. To the south by the new Yonkers-Alpine Bridge, at least two new passenger railroad tunnels into midtown Manhattan, the 4th tube of the Lincoln Tunnel, at least two additional sets of parallel tubes to the Holland Tunnel, plus the new multi-model Cross Harbor I-287/I-78 Highway-Railway Tunnel connecting Brooklyn directly with New Jersey. This is all long overdue.

The political elites alas don’t give a shit, even after 911 which is exceptionally galling.

Look at how NY State officials botched and crumbled the idea of a West Side Highway Tunnel alongside the WTC which at should be designed at least to provide a seemless connection with the Brooklyn Battery and Battey Park Tunnels. Yet NYS DOT never came up with a truly such adequate proposal instead pushing these short assed shallow tunnels precluding a new downtown underground pedestrian concourse, now instead we get a “Freedom Tower” with a trade off of its 20 floors being essentially un-rented space.

Indeed, look how they folded on Westway during the 1980s.

Like it was all an excuse to distract the masses, showing the “progressives” and “environmentalists” as fools.

Likewise with “limited government”/”conservative assholes who identified the great waste of money as Westway but were okay with spending billions for that cigarette market protection racket of a drug war, prisons, courts, “treatment” and other assorted bullshit. ‘Fiscal conservative’ Lew Lerhman was such a Knights of Malta suck up assh*le.

Beware any politicians.  Whether, Knights of Malta, Opus Dei, Phi Crappa whatever college fraternity, or directly rather than indirectly Masonic, such as Al Sharpton, without understanding it as something than mere personal advancement.  It's not good to so neglect our infrastructure life-lines -- which is what roads are.


2012 - April 1 - South Mall Blogger
http://southmallblogger.blogspot.com/2012/04/2012-april-1.html

Friday, December 18, 2009

My Conversation With a Shill For Thoughtless Development

http://www.motthavenherald.com/2009/11/24/state-won%E2%80%99t-build-new-ramps-on-deegan/comment-page-1/#comment-679
19 Responses to “State won’t build new ramps on Deegan”
  1. [...] Opposition to expanding the highway was widespread. Community activists, city officials, and electeds — including Congressman Jose Serrano — condemned the proposal as a threat to redevelopment planned for the Harlem River waterfront. Transportation advocates warned that the project would attract more traffic, negating the promised reductions in congestion. [...]

  2. Douglas Willinger

    24. Nov, 2009

    Wow! Wait until the area is all built up, making the highway rehab more expensive to taxpayers, but oh well, orchestrate and steer a controversy for some powerful entity that wants to build its towers more quickly, bringing in 1,000s of new residences and vehicles, behind a wall of an elevated highway separating themselves and the waterfront from the inland. Mark Gorton serves his masters at Credit Suise. Nice how they have that one meeting that though barely advertised to the public, is filled with opponents and apparantly none of the road’s users. And then, you have NYSDOT [first] issuing not a press release, but rather a call to Streetsblog?


  3. MottHavendude

    01. Dec, 2009

    Douglass your comment is spoken like the typical DRIVER WHO DOESN’T LIVE IN THE COMMUNITY. People actually live here, and are forced to deal with the Major Deegan that plows through the community. And you are complaining that the community doesn’t roll over as the development plans to FINALLY open the waterfront, build affordable housing (did you notice we need more of that?), parkland (yeah we don’t have much of that either), decrease car traffic/exhaust (we have a bit of an asthma problem here due to the significant amount of cars/trucks on that Deegan), have just been approved and will be crushed so that YOUR commute from who knows where is slightly better? I mean really? Is this your argument? It has ZERO to do with Credit Suisse, and EVERYTHING to do with OUR COMMUNITY. But what do you care…you don’t live here. If you cared enough about the expansion of the Deegan ramps, you should have made it your business to be informed and attend the meeting. Feel free to come to ANY of the Community Board 1 meetings and voice your opinion about the issue. We would be happy to hear how you know whats best for the community and the city of NY.

  4. Douglas Willinger

    03. Dec, 2009

    Dude-

    You can have the development.

    But why must it infringe on the much needed ramps? Do you think it makes any sense to add 10,000 residents to an already overcapacity interchange without even leaving room to upgrade the ramps?

    And why jam in an elevated highway rather then what Cincinatti did that would really open up the waterfront, rather then create the cul de sac comminty that you shill for?

    http://cos-mobile.blogspot.com/2009/11/i-87-cromwell-avenue-tunnel.html

    Why do you state that you are concerned with asthma when you will create even more of a traffic jam by not doing the Fort Washington Way with cover and filtration. The “Streetsblog” position is all about the public be damned just to make a development project a bit more sprawling?

    That NYSDOT has a single meeting announced reportedly 3 days beforehand, and makes a decision on that shows that it is simply cherrypicked with paraochialists.

    http://cos-mobile.blogspot.com/2009/11/chock-deegan.html

    Any meeting about the Deegan ought to be better announced, including the people using the highway.

    A decision based on such an obviously cheery picked audience, and one so obviously steered to make this cul de sac development a bit larger is clearly invalid. So does that fact that the matter is unreported by the major newspapers- to keep the general public uninformed. Its all about hoodwinking the public, which the parochialists are good at.

    But yes, the ruling class tool Mark Groton does his work well, as do the handlers of this “community” based opposition that would have Mott Haven become further walled off from the waterfront for the sake of a cul de sac development obviously pushed by something towards the top of the political pyramid.

    A development along and atop a depressed. covered filtrated Deegan would be far better for everyone.

    But again, as perhaps with the Washington, D.C. South Capitol Mall being canceled for that Nationals Stadium, when the top of the pyramid wants something, the unthinking minions just say yes.


  5. Douglas Willinger

    03. Dec, 2009

    “If you cared enough about the expansion of the Deegan ramps, you should have made it your business to be informed and attend the meeting.”

    I do care and I do follow transportation.

    But my, a single meeting barely announced (and even them only afterward by TSTC and Streetsblog) and obviously cherrypicked and unannounced to the using public, and you treat it like gospel.

    By that logic, lets have decision made on a transit project upon as sole barley advertised meeting. By defending the cherry picking process you essentualy state that you favor decisions made by the elite, suger-coated with rhetoric (but not logic) about serving existing communities.

    That is the mark of a top down directed mission where the politicians relied upon their handlers, and not any independent analysis.

  6. MottHavendude

    04. Dec, 2009

    Douglas your opinions are tragic indeed. The new development that we “shill” for is NOT in lieu of new Deegan ramps, it is just coming FIRST. The community does not want to jeopardize in any way the future redevelopment of the site, or the access to the waterfront, so they are redeveloping the community FIRST, at which time the Deegan ramps, should they be necessary in the future, very well can be built and will likely be revisited at some point. HOWEVER, if we build the ramps FIRST, it compromises what can/can’t be done to redevelop the area and will cut-off the waterfront. So why would someone choose to do that first? So your 45 minute commute down the Deegan from Sleepy twig, NY will be 2 minutes faster? Really?

    The community is already shaped enough by highways, off ramps, truck traffic, and commuters like yourself. We do not live around the highways, they live around us…and as such the redevelopment is being built based on the community’s needs and the city’s interests, not your commute.

    What you fail to realize, as most far-flung commuters with no knowledge of the community do, is that they are redeveloping along this site because A: It has substantial underutilized land that is perfectly situated adjacent to Manhattan, and with the benefit of opening the entire waterfront for the FIRST time. and B: It is along TRANSIT routes, including Metro-North, 2/4/5/6 train lines so that those that move into the area are NOT those that are dependent on cars or expect to have driveways. The car traffic that come with an increase of 5,000 people of which you speak of is typical of new developments in suburbia (where you live), NOT NYC transit based development, which is what we have here.

    Your rhetoric of a ‘cul de sac” community is quite laughable, and reflects your inability to look past your suburban life. What the city is creating here is NOT a closed off waterfront community, it is an OPEN waterfront with parks, green space, outdoor restaurants, pavilions, bike trails, and pedestrian zone. Your are demonstrating a total lack of information regarding this redevelopment, as well as a complete ignorance of the community and how it will reshape the Southern Bronx and move the city forward. But then again, how much would one know about either when they are simply driving through in the mornings and evenings.

  7. Motthavendude

    04. Dec, 2009

    (contd)..
    It should also be noted that if you feel so strongly regarding the new Ramps, why don’t you come to the community board #1 monthly meetings and express your opinion. If you believe it is that important, why not educate us and convince us otherwise? You clearly expressed an interest and claim the meetings were “held in secret”, but had you been INVOLVED in the community from the beginning, you would have known all about these meetings. They were not held in secret, they were publicized to EVERYONE with ANY interest. Here is a great way to keep abreast of other such events: Involve yourself with the community instead of relying on random blogs for information and you just might discover alot more that you are missing, and you hopefully will be more capable of forming an educated opinion about the community and its goals.

    If I don’t see you at the next community board #1 meeting, I am sure I will see you sitting in traffic on the Deegan.

  8. Douglas Willinger

    07. Dec, 2009

    You defend a meeting that was essentially unannounced to the general public, filled with a group of people steered to protect the maximum amount of space for the development, disregarding the fact that there is plenty of space for development and the ramps.

    But some entity at the top wants to jam in a cul de sac development- why don’t you look at the development plans on the NYSDOT site which show it as such?

    If you really care for the community (defined as more the general public rather then the developers and their shillers) why no mention of the Fort Washington Way style tunnel with filtration, which would help everyone?

    The shilling for making this development have more space and happen quicker ought to be a textbook example of elitism running amock all for a wealthy cul de sac enclave wedged between the waterfront and an elevated highway that I would like to bring down.

  9. Motthavendude

    08. Dec, 2009

    Douglass why do you keep repeating that the meeting was unannounced to the general public. IT WAS ANNOUNCED, as are ALL NYSDOT hearings…so please take responsibility for not being informed. It was a full house of people who made it their business to be informed about the project and state their opinions. Had you been involved in the community you would know this, but you are not. So why are you voicing your nonsensical complaints on this website now?

    There is NO entity at the top that is dictating this development. This clearly demonstrates your profound ignorance as to who is shaping this development: THE COMMUNITY. How many Community Board #1 meetings have you attended? The answer is ZERO. How do I know this? Because this project has been discuss ad nauseum for over a year with the community, local, city, and state officials. Had you attended any of these meeting you would A: Have known when the hearings were and B: Would not be making ignorant, uninformed comments on this website.

    Elitism is not what governs the Mott Haven community, it is the community. Secondly, I would like to know how one could possibly describe this redevelopment as “wealthy.” IT IS AFFORDABLE HOUSING, with parks, bike trails, pedestrian zones, and retail. There is NO “luxury” component/housing of any kind..why? THE COMMUNITY DOES NOT WANT IT. How do I know this? I GO TO THE MEETINGS. And again you describe it as a “cul-de-sac” when in fact it OPENS the waterfront, NOT closes it! You are welcome to keep repeating lies, but it doesn’t make them true.

    The fact remains you know nothing of the community, you do not live in the community, you care nothing for the community, and your sole interest is in shaving 2 minutes off your 45 minute commute down the Deegan from Sleepy Twig, NY. Until you educate yourself about this redevelopment and attend ANY meetings, please refrain from spewing nonsense.

  10. Douglas Wilinger

    08. Dec, 2009

    Your sole interest is increasing the available land that is quickly available for this cul de sac development. The NYSDOT report itself has it has a cul se sac recommended in the area of the ramps- perhaps because of the heavy traffic.

    The meeting was hardly advertised — what on a Friday 3 day before the meeting — and filled with people mouthing the exact same thing (apparently- as I am going by the meger reports) with NONE mentioning the Fort Washington tunnel-filtration concept?

    Why would no one mention these things is they were so concerned or informed?

    Any why is NYSDOT making decisions on a single basically unadvertised meeting apparently without the users? Why no billboard along I-87 advertising it to the users? No meeting on a transportation artery should lack advertisement to the people using the facility- but they apparently do not matter to parochialists such as yourself.

    What you will accomplish is hemming in the highway, making it 3x expensive to underground, hence confirming the existing highway wall. By definition this screws the existing community. but the new development will sit behind its elevated highway and its presumable heavy sound glass. You will increase pollution and health problems by further over taxing the ramps and making it far more difficult, expensive and unlikely that the highway would be buried and filtrated. Why is it that the upper west side and the Gowanus area advocate for a longer term tunnel solution while the Mott Haven community gets steered to sanction keeping up the wall of the elevated highway?

    You ought to tell the Jesuit Fordham “new urbanists” that we can do far better for Mott Haven.

    How does it feel to sell out your area for pleasing some $#%@& at the top of the political pyramid who wants to get how tower up before he dies?

  11. Douglas Willinger

    09. Dec, 2009

    A small group of people discussing something used by a great deal more people, and discussing it particularly without anything posted to the internet where users are likely to find about it in this day and age, is elitism. If there is to be a discussion about any transportation artery, that must include BOTH those alongside it and those using it- the latter for instance with signs-billboards announcing the meeting at least 30 days in advance.. Otherwise its is something that NYSDOT has no business basing a decision upon.

    Telling me that I “care nothing for the community” is a strange charge considering that I am the one addressing concerns about noise pollution with proposing a “Fort Washington Way” ultimate tunnel solution allowing even more development space, while you instead would choose remaining oblivious to anything other than maintaining the existing WALL of an elevated expressway for the sake of building the development a few years quicker- and disregard how much more expensive this sort of anti-development makes burying and filtering the highway in the future. What you are advocacy is placing developer profit above the broader social good. Apparently by “community” you certainly mean far fewer people then do I. Everyone else should suffer merely to make the development a bit larger more quickly.

    Compared to the Riverside South Boulevard and Gowanus Tunnel projects why do you insist upon the extra and quicker space of cramming in the existing elevated highway -placing some 10,000 new residents in such close proximity to the exposed highway and continuing to expose the area to the unfiltered vehicular exhaust?

    Can the future generations of people living there sue the government for allowing such planning?

  12. MottHavendude

    09. Dec, 2009

    Douglass I am very sad to see you are still here making pointless complaints. Why are you here alleging a conspiracy and elitism by the NYSDOT because YOU did not stay abreast to what is happening in MY community? If you have a problem with the standard procedures/announcements the NYSDOT uses to advise the public about hearings, PLEASE TAKE IT UP WITH THEM. Those that cared enough about it made it their business to stay informed, and attended the meeting. Had you attended any Community Board #1 meeting, or this meeting, you would note “elitism” is the last word used to describe those contesting the Deegan ramp extension.

    If it were up to me I would eliminate the Sheridan, greatly limit truck traffic and have 90% of distribution done by rail/barge in and out of Hunts Point, NOT expand any other highways in the city, bury all highways, and filter accordingly. However, life is not fair, and as a result, you must pick and choose your battles…welcome to the real world. The “Fort Washington Way” is a great idea, and if it were up to me I would do it, but let’s get back to reality. The redevelopment will NOT proceed should that requirement be implemented because it is too costly when combined with this new redevelopment.

    So as a community we had a decision to make: Is it more important to redevelop the area, provide a significant amount of new quality, affordable housing, parkland, retail, pedestrian zones, bike trails, open waterfront, and improved infrastructure, OR Is it better to expand the Deegan ramps first, which would cut off the waterfront and permanently diminish the potential for this development. The community chose to move forward with this development, and to revisit the extension of the Deegan ramps later, because we have the opportunity RIGHT NOW to make this dream happen. It may not happen again in our lifetimes…as it has taken decades just to get to this point.

    Would the community like to have all highways buried and filtered? YES. Will we kill this development for possibly our lifetime just so that we can get a stretch of the highway buried? NO.

    Had you attended any of the Community Board #1 meetings, you would have had the opportunity to state your case and convince people otherwise. But you chose not to…so you don’t care. If you did care, you would have made it your business to attend the meetings, but instead you choose to complain and whine on a blog.

    We, as a community, and the city of NY, will move forward with this development because we have the opportunity NOW, and will revisit the Deegan ramps and possible “Fort Washington Way” proposal IN THE FUTURE. Don’t like this decision? Get off the keyboard, drive down to the Community Board #1 meeting, and state your case. Otherwise, why do you continue whining on these blogs?

  13. Douglas Willinger

    15. Dec, 2009

    Why is “this” development– the specific proposal rather then the concept of the area’s redevelopment?

    Doing the development first will make burying the highway later way more difficult and expensive- please refer to Brooklyn’s Gowanus Tunnel proposal (NYSDOT) that has evolved towards a waterfront tunnel rather then directly beneath the existing elevated highway. Why should a particular development plan proceed without study of alternatives, nor cost studies of different such alternative plans?

    Why proceed with this particular plan without even considering a Fort Washington Way “Cromwell Avenue Tunnel” with configurations allowing greater flexibility and waterfront access. How after all is hemming in the existing ELEVATED Deegan making the waterfront more accessible for many people?

    BTW- I support widening the highway right of way, but conditionally that it be undergrounded ala the Fort Washington Way.

    As for you last point- because ‘telecommuting” is infinitely more practical- though I will gladly attend any future meetings provided at least some advance notice- again, why nothing upon the billboards along that stretch of I-87 if its a decision more broadly community based. Please don’t forget that the meeting was publicly announced only 3 day beforehand- and conspicuously not to the using public, and notably so far unreported by the major NY City newspapers!

  14. MottHavendude

    15. Dec, 2009

    And here we go again Douglas. Can somebody please cancel this guy’s internet access [bold added]. Let’s try this one last time: HAD YOU BEEN TO ANY OF THE PAST 2 YEARS OF COMMUNITY BOARD #1 MEETINGS, YOU WOULD KNOW THAT WE HAVE ALREADY DISCUSSED ALL OF THESE OPTIONS IN DETAIL. YOU WOULD ALSO HAVE KNOWN WE HAVE HAD SEVERAL MEETINGS SPECIFICALLY WITH THE NYSDOT REGARDING ALL OF THESE ISSUES. YOUR IGNORANCE TO WHAT IS HAPPENING WITH THIS DEVELOPMENT IS PRECISELY BECAUSE YOU GET YOUR INFORMATION FROM RANDOM BLOGS AND NOT FROM THE SOURCE: THE COMMUNITY BOARD MEETINGS.

    What you are seeing TODAY is the result of MANY meetings with MANY groups, and we have discussed it and made our decision. IF YOU WANT TO KNOW WHY WE MADE OUR DECISIONS, COME TO THE COMMUNITY BOARD #1 MEETINGS, STATE YOUR OPINION, AND ASK WHY WE HAVE CHOSEN OTHERWISE. THE END.

    And lastly, if you are unhappy with the NYSDOT’s standard procedures for notifying the public regarding their meetings, TAKE IT UP WITH THEM. The Bronx, nor the Community Board, nor anyone else, makes those decisions. IF YOU WANT THE NYSDOT TO PUT UP BILLBOARDS ON HIGHWAYS FOR COMMUTERS, GET OFF THE KEYBOARD, GO TO THEIR OFFICE, AND MAKE THE RECOMMENDATION.

    Why are you continuing to waste everyone’s time with ill-informed arguments/recommendations on random blogs? INFORM YOURSELF. STOP BLAMING THE WORLD FOR YOUR IGNORANCE AND LAZINESS.

  15. Douglas Willinger

    17. Dec, 2009

    Where was any of this done in public on the internet? I for instance frequently research the area highways, such as via Steve Anderson’s nysroads.com, and saw nothing about any meeting.

    In this day and age, why should anyone defend having the discussions — for such an important matter — in such traditionally confined circumstances?

    Did Robert Moses ever so strongly defend keeping the public so un-informed?

  16. Motthavendude

    17. Dec, 2009

    TAKE IT UP WITH NYSDOT. THE END.

  17. Douglas Willinger

    18. Dec, 2009

    Your evasiveness and defensiveness is quite telling, Mr. Shill for the wealthy, influential, & thoughtless.

    The NYSDOT decision is baseless, and your attitudes admit it!

Monday, November 30, 2009

I-87 Cromwell Avenue Tunnel

Mott Haven, Bronx, N.Y. Major Deegan Expressway
An alternative proposal not yet considered...
Cut and cover tunnel to boast waterfront access, development, cut air pollution via filtration

Groups as the Tri State Transportation Campaign Streetsblog and Mark Groton's Streetsblog Sell the Bronx Short for speeding cul de sac waterfront along wall of the existing elevated highway, that will hem in the Deegan, intensify traffic congestion -- remember that the Nov 2009 NYSDOT decision is to NOT preserve space for the ramp widening by allowing development placing some 10,000 new residents adjacent to this highway which should be buried and filtered -- hence instead maintaining this devise elevated highway for the next half-century.

Such planning that hems in the highway makes burying that highway far more expensive to construct- a matter officially UNconsidered.

Such is but what could become a future text book example of an intrinsically detrimental dogmatic stance against highways here used to prevent them from considering more environmentally friendly highway designs
- such as the concept of filtrated tunnels, for what would be the I-87 Cromwell Avenue Tunnel.

Cromwell Avenue runs from Yankee Stadium at a southwesterly angle towards and then along the riverfront, parallel and actually closer to the adjacent River Avenue, ending unceremonially beneath the existing I-87 viaduct, running into Exterior Street which continues southward paralleling the southbound side of I-87 as its service road, that’s fed by the southbound ramp from I-87 just north of the intersection/interchange with 138th Street, where this off-ramp and service road traffic has a traffic light intersection traffic often backs traffic onto I-87.

Immediately south of this interchange where I-87 transitions to a short underpass, I-87 curves to the east, rising up again as an elevated highway before encountering higher topography where it becomes depressed passing beneath Willis Avenue. Much of the southbound I-87 Deegan off-ramp traffic at the interchange with 138th Street continues ‘straight’ along the Deegan service road in order to make the right turn onto the Willis Avenue Bridge into Manhattan.

Project would reconstruct Cromwell Avenue, and area surface streets with this segment of I-87 to run in new cut and cover tunnel extending from approximately 150th Street southward to reconstructed underpass beneath 138th Street. Project would take cost advantage via being built BEFORE mass development, employing existing industrial properties alongside the existing I-87 (further facilitating construction by allowing maintaining traffic) for constructing the new southbound I-87 tunnel box, which would temporarily handle both directions of traffic while the existing I-87 viaduct is torn down and the northbound box constructed.

Project would likewise submerge the new widened ramps, while providing a tunnel box conduit for the straight through southbound service road traffic to bypass the surface on the way to the Willis Avenue Bridge, providing for a southern extension of Cromwell Avenue atop and then swinging to the south side of I-87 as it turns east, improving pedestrian accessibility to the waterfront with the tunneled southbound ramp, and overall local accessibility towards the southernmost waterfront with the Cromwell Avenue extension. Project would include I-87 reconstruction with sections of urban decks atop I-87 between 138th Street and the Metro North RR there terracing down towards the waterfront, and in the vicinity of Willis Avenue. The I-87 Cromwell Avenue Tunnel would effectively extend continuously from about the Grand Concourse to approximately 150th Street on the approach to Yankee Stadium[s].

Project would open up acres and acres of new land for public use and private development, with footings designed to support development (buildings) atop the highway tunnel to hence allow greater developable square footage, with funds from the sale of air rights. It would also reduce air pollution by employing a tunnel’s ability to trap emissions with filtration systems, respectively locally and regionally with increased capacity for the ramps (needed to address the current levels of congestion and the future levels of traffic at that 138th Street interchange with 10,000 new residents within this new Harlem Riverfront Development), and the mainline (with a minimum of 4 lanes in each direction for its importance and scarcity as a major north-south artery into NYC and through the southern Bronx, feeding Queens County, Long Island and beyond via such things as the Hunts Point Terminal, a major industrial area featuring not only numerous scrap yards, but also the large food distribution businesses that live off of truck accessibility, particularly as a parallel alternative to the underutilized Sheridan Expressway which requires such traffic to also use the highly over-utilized western portion of the Cross Bronx Expressway. As widening that later road would be far costlier, and displace thousands of residences, encouraging some of its traffic to divert to a widened lower I-87 that ran in a filtrated tunnel continuously southward form say 150th Street to the Metro North RR would reduce traffic emissions, and hence asthma rates, not even taking into account the increasing prevalence of cleaner and cleaner automobiles.

A project precedent, in design and size: Cincinatti, Ohio’s waterfront interstate highway ‘Fort Washington Way’ reconstruction, which replaced a 1950s design 6 lane depressed freeway (with sloped embankments and frequent ramps) with a 1990s design 8 lane depressed freeway within a ¾ concrete box with vertical retaining walls designed to support the addition of a roof to make it a full cut and cover tunnel. This stageability makes it more affordable over time.

Photos below from: http://www.cincinnati-transit.net/fww-2000.html

The City of Cincinnati tapped PB for a $150 million reconfiguration of the 1.5-kilometer (0.9-mile) Fort Washington Way interstate connector. As the city reconsidered the project, it added an additional $160 million of new viaducts, ramps, improvements, watermain replacements and an underground transit center—without extending the original schedule.

The efficent tunnel box design creates low cost underground space beneath the freeway's service roads.

Illustrations below from: http://www.riverside-south.org/highway.html



Tunnel box allows superior space utilatilation for freeway and adjoining developement, with sound containment of tunnel ideal for accomodating greater real estate developement within close proximity

The NYC area is hardly altogether unfamiliar with the concept of building highway below, notably with portions of the East River (FDR) Drive as well as the now under construction Riverside South Boulevard extension box tunnels for the future relocation of the 9A Henry Hudson Parkway. As such it has had proposals for so effectively burying significant segments of essentially that latter highway’s southern extension (the 1974-1985 ‘Westway" project of the West Side Highway largely in concrete box tunnels through new landfill), and later for that same highway’ continuation from Manhattan (2002-2005 proposed ‘West Street Tunnel’), and into Brooklyn (the 1996+ Gowanus Expressway Tunnel project then championed by the Regional Plan Association, and even written about favorably by such organizations as Tri State Transportation Campaign, that was to be routed paralleling the existing highway viaduct beneath 3rd or 2nd Street, but now planned instead to run directly along the waterfront. All said and done, it has been the Riverside South project that has began, with its favorable attributes rendering its construction to be relatively inexpensive. Its advantages included:

- out of the way of traffic
- no utility relocation
- no excavation, as a concrete box on land, with its open space to the west sculpted with earthen fill creating a sloped hill – a grassy knoll – up to the Riverside South Boulevard now on the surface.


From http://www.riverside-south.org/highway.html:

Funding the tunnel shell now (rather than building it in 10-15 years from now) will:

• Avoid the disruption to the local community resulting from the need to dig up part of the new Riverside Boulevard and the newly constructed Riverside South Park in order to achieve the relocation;

• Save $50 million by avoiding the costs to dig up and rebuild Riverside South Park and Riverside Boulevard; and

• Utilize the $60 million being invested by the developer to build the northbound lane and the land contributed by the developer needed to construct the southbound lane as the required 20% local share of any federal funding - no State or City matching funds will be required for the highway relocation.

Significantly, with the $110 million savings ($60 million contributed by the developer and $50 million in savings) resulting from the early construction of the tunnel shell, the cost of the refurbishing alternative and the relocation alternative will be approximately equal.

The immediate funding needed to complete the southbound lane of the tunnel shell between 62 nd and 67th Streets before building the park, is about $94 million. This project is shovel ready and should be considered for funding under the Federal stimulus funding program and/or the City should require Extell to provide funding for the for the relocation. We have asked the Governor and the Mayor for the funding to build the tunnel shell in coordination with construction of the buildings and park by the developer - the work that can be completed during the next two years.

Through the efforts of a bipartisan group of Congressmen and Senators (including Senators Schumer and Clinton and Congressman William Green, Sue Kelly and Jerrold Nadler) over several years, $21 million in Federal earmarked funds have been made available. $5.7 million has been spent on the EIS and engineering work and $15.3 remains available. We need the cooperation of our senators and congressman to make these funds available for building the most southern section of the tunnel shell and the park, which will not be completed during the next two years.



That contrasts favorably with the 2002-2005 NYSDOT designs for the proposed "West Street Tunnel", a cut and cover tunnel beneath an existing street, with its significant utility conflicts increasing the construction costs, notably a sewer pipe that actually could have been avoided.

An I-87 Cromwell Avenue Tunnel (I-87 CAT) enjoys the most favorable combination of factors of any tunnel requiring excavation.

- out of the way traffic, via staged construction starting with new southbound I-87 CAT within the now lightly developed industrial properties alongside I-87’s western (southbound) side.
- Little or no additional utility relocation or building removal as the I-87 CAT Project employees the footprint of existing industrial land that has been recently re-zoned for high rise development, with its cut and cover design accommodating footings for maintaining planned developable square footage.
- Opportunity to reconnect lower Grand Concourse area up to the Yankee Stadium Park with the waterfront via I-87 CAT
- Opportunity to reduce air pollution via highway tunnel filtration, locally in the vicinity of Mott Haven, and further away particularly along the western portion of the stressed Cross Bronx Expressway, as an alternate route to the Hunts Point area then the former which is used in conjunction with the Sheridan Expressway.
- An opportunity hence to improve in every way a critically important north-south highway into NYC.

All of these benefits are thwarted with NYSDOT’s reported November 20, 2009 decision to defer any increase in the capacity of the I-87 ramps at its interchange with 138th Street until after the area is built out. Note that the proposed development district extends right up to the edge of the existing I-87 viaduct, leaving precious little space for ramp expansion, only worsening the congestion and pollution along a 1930s design Major Deegan Expressway at one of the most congested interchanges where new real estate development adds 10,000+ new residents and untold numbers of vehicles, while requiring any tunnel replacement to be built directly beneath the existing viaduct, likely increasing the costs by 100s of millions of dollars.

There’s has apparently been no consideration of a tunnelization of Mott Haven I-87, not even amongst those citing asthma rates, with no mention of tunneling nor tunnel filtration as already done overseas.

List of such places with filtrated road tunnels

Why then not any of the highways in the Bronx?

By spouting doctrine they neglect imagination…

http://cos-mobile.blogspot.com/2008/02/filtration-of-vehicular-exhaust-in-road_27.html


http://cos-mobile.blogspot.com/2008/02/going-below-big-roads-below.html


http://cos-mobile.blogspot.com/2008/02/recycling-right-of-ways-ad-other_5329.html


http://cos-mobile.blogspot.com/2008/02/avoiding-forseable-conflicts_27.html




Chock the Deegan!

Cram This-


Next To This!
without leaving room for wider ramps
while adding perhaps 10,000 new residents


NYSDOT sought to spend $240-340 million to reconstruct the elevated I-87 Major Deegan Expressway segment --- widening its ramps to and from the north to 138th Street

Let’s continue to ignore the broadest segments of society:

- continue to settle for maintaining the wall of the elevated freeway, regardless of # of lanes
remains an elevated wall separating people from the waterfront
- continue to neglect motorists, particularly bus drivers and truckers by not bringing the lane widths
up to standard when we have the chance

Let’s make more of a traffic mess:

- don’t expand the 138th Street ramps
- then add 10,000 new residents and consequently many more vehicles there

Let’s hurt the South Bronx’s economic competitiveness

- chock Hunts Point by constraining the Deegan Expressway and its ramp capacity, especially while calling for eliminating the largely parallel Sheridan Expressway

All by allowing organizations which dogmatically oppose any highway expansion, and which almost always neglect calling for more advanced types of highway design for better harmonizing highways into the areas they pass through.

Manhattan’s East Side has its East River Drive beneath parkland
Manhattan’s West Side has its Miller Highway Tunnels beneath Riverside South boulevard
South Bronx’s Mott Haven gets to maintain its Elevated Deegan Expressway segment wall off its waterfront

Let’s treat the South Bronx like a series of afterthoughts

- first construct new high value waterfront real estate development bringing in 10,000 new residents
- leave precious little space for more capacious ramps, nor for lowering the wall, aka depressing and covering this segment of I-87 making such way more expensive then doing in coordination, such as done with Manhattan’s Riverside South

Don’t even dare consider an I-87 Deegan tunnel for Mott Haven

- that would be significantly easier and less expensive to coordinate rather then construct as an afterthought later
- that would eliminate the wall, allowing greatest local access to the waterfront
that would facilitate pollution reduction with the tunnel trapping emissions and equipped with filtration as done overseas
- that would reconcile industrial trucking access needs with more capacity and local waterfront neighborhood environments and with extra capacity serve to relieve the highly congested western Cross Bronx Expressway
- that could be funded with lobbying for future economic stimulus funds- in the spirit of the slogan ‘yes we can!’

but that would take months if not a few years more to plan out, hence delaying the new real estate development projects

Just continue to defer to organizations as the "Tri State Transportation Campaign" and Streetsblog, and the calaphony of lock-step march organizations so disdainful of highways they can’t suggest better designs, and that have steered the ‘debate’ along with a not very imaginative nor necessarily forthcoming NYSDOT hierarchy.

Illustrations: TSTC logo, Mark Gorton on bike and closeup

Rather its about some powerful entity wanting to build something and perhaps do so quickly perhaps before some pivotal figure’s death